Thermo Products R-410A installation manual Control PNK BLK BRN

Page 14

835961-UIM-D-0213

LEGEND

CAP - CAPACITOR

CC- CONTACTOR COIL CCH - CRANKCASE HEATER HPS - HIGH PRESS SWITCH HS - HEATER SWITCH HTS - HIGH TEMP SWITCH LS - LIQUID SENSOR LPS - LOW PRESS SWITCH RV - REVERSING VALVE SC - START CAPACITOR SR - START RELAY

FAN MOTOR

RED

R

COLOR CODE

BLK - BLACK

BLU - BLUE

BRN - BROWN

GRN - GREEN

GRY - GREY

ORG - ORANGE

PNK - PINK PUR - PURPLE

RED - RED

WHT - WHITE

YEL - YELLOW

DANGER - SHOCK HAZARD

TURN OFF ELECTRICAL POWER BEFORE SERVICING

TO PREVENT POSSIBLE DAMAGE TO THE EQUIPMENT AND POSSIBLE PERSONAL INJURY.

CAUTION

TO PREVENT ELECTRICAL SHOCK OPENREMOTE

DISCONNECT SO ELECTRICAL SUPPLY TO HEAT

PUMP IS SHUT OFF.

1COMPONENTS SHOWN IN DASH LINES ARE OPTIONAL.

DUAL CAPACITOR SHOWN. SEPARATE

2CAPACITORS MAY BE USED ON ACTUAL UNIT.

3WIRING MUST CONFORM TO NATIONAL AND LOCAL CODES.

IF ANY OF THE ORIGINAL WIRE SUPPLIED

WITH THIS UNIT MUST BE REPLACED, IT

 

 

 

GRN

GND

BLK

 

 

 

 

 

 

 

BRN

C

 

 

 

 

 

 

 

 

S

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

5

3

 

4

 

2

1

PLUG

 

 

RED

 

BRN

WHT

 

 

BLK

 

 

 

 

 

 

 

 

RED

COMPRESSOR

 

 

 

 

 

 

 

 

 

R

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CAP

 

 

C

 

 

 

 

 

 

F

 

BRN

 

 

 

 

 

 

 

RED

 

 

 

S

 

 

 

 

 

 

H

 

 

 

 

 

 

 

 

C

 

 

BLK

 

 

 

 

 

 

 

BRN

 

HPS

 

 

 

 

RED

 

 

 

YEL

 

 

 

 

 

 

 

YEL

 

 

 

 

 

SR

 

 

PNK

PNK

 

 

 

YEL

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SC

 

2

 

BLK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

BLK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CCH

 

 

 

 

 

 

 

 

 

 

ORG

ORG

 

 

 

 

 

 

 

 

 

 

HS

BLK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RED

BLK

 

BLK

BLK

 

 

 

BLK

 

RED

ORG

 

BLK

 

 

 

 

 

 

 

 

 

 

 

 

 

T2

 

 

 

BLK

 

X/L

 

 

RED

 

 

 

T1

 

R

C

 

 

 

 

 

 

CC

 

 

 

 

 

 

L2

 

 

 

GRY

 

 

 

 

 

 

 

 

 

L1

 

PUR

RED

BLK

 

 

CONTACTOR

 

 

 

 

 

 

 

 

 

 

 

 

 

USE COPPER

 

 

 

 

 

 

 

 

CONDUCTORS

 

 

 

 

 

 

 

 

 

ONLY

 

 

 

 

 

 

 

4

MUST BE REPLACED WITH 105 C THERMOPLASTIC OR ITS EQUIVALENT.

WHERE POWER SUPPLY HAS ONE (1) 240

5VOLT CONDUCTOR AND ONE (1) NEUTRAL CONDUCTOR, CONNECT L2 OF CONTACTOR TO NEUTRAL.

HIGH VOLTAGE FACTORY WIRING

LOW VOLTAGE FACTORY WIRING

OPTIONAL OR MODEL SPECIFIC

FIELD WIRING, LINE VOLTAGE

 

 

HTS

 

 

BRN

LPS

 

 

 

 

 

 

BRN

 

 

 

 

 

 

PNK

PNK

 

 

 

 

 

 

 

YEL

 

 

 

 

 

 

 

PNK

 

 

 

COND

 

 

 

 

 

 

 

FAN

 

 

GRY

 

 

 

 

 

M

 

LS

 

 

 

 

DFST

T'STAT

BLU

 

 

 

 

 

DEFROST

 

 

 

YEL

 

 

PRES

SWITCH

 

CONTROL

 

 

 

PNK

 

 

 

 

 

 

 

 

 

 

 

BLK

BRN

 

 

 

W1/66

REV

VALVE

PNK

Y

O

W

 

RV

 

 

 

 

 

 

 

YEL

ORG

WHT

BRN

 

 

 

 

SEE UNIT INSTALLATION INSTRUCTIONS

FOR LOW VOLTAGE TERMINATIONS 208-230 VAC 60 Hz

1 PHASE SUPPLY

￿￿￿￿￿￿￿￿

544123-UWD-B-0412

FIGURE 15: Wiring Diagram - Single Phase (Time-Temp)

14

Johnson Controls Unitary Products

Image 14
Contents List of Sections Section II SafetyTHGD,F/GHGD/THJD,F/YHJD,F/YHJR/THJR Series List of FiguresADD-ON REPLACEMENT/RETROFIT Section III Unit InstallationRequirements For Installing/Servicing R-410A Equipment LimitationsUnit Placement Ground InstallationRoof Installation Precautions During Line InstallationPrecautions During Brazing of Lines Precautions During Brazing Service ValveInstall Schrader Valve Core and Orifice as follows Section IV Orifice InstallationSection V TXV Installations Measure Indoor Air Flow Section VI EvacuationSection VII System Charge Charging the UnitSection Viii Electrical Connections Field Connections Power WiringField Connections Control Wiring General Information & GroundingCFM Selection Board Settings Dehumidification ControlSection IX System START-UP Energize Crankcase HeaterSection V System Operation Operation Compressor DelayDemand Defrost 13 Seer 1.5 ton, 14.5 Seer 1.5-4 Ton Defrost CurvesSection VI Instructing the Owner Section VII Wiring Diagram Wiring Diagram Single Phase Demand DefrostControl PNK BLK BRN BLK FAN CAP Compressor Relay CCH FAN ORG Relay UIM-D-0213 Johnson Controls Unitary Products Section Viii Start UP Sheet Heat Pump and Supplementary Heat Start-Up SheetAir Side System Total External Static Pressure Owner Education York International Corp York Drive Norman, OK