15.Circuit Board and Component Sequence of Operation
Fig./ABB 1 |
|
|
| Fig./ABB 2 |
|
| |
|
| START UP |
|
|
| START OF FREEZE CYCLE | |
|
|
|
|
|
| ||
Fig./ABB 3 | LED BLINKING EVAPORATOR |
| Fig./ABB 4 |
|
| ||
|
| TEMPERATURE HIGH |
|
|
|
|
|
| LED CONSTANT CONDENSER TEMPERATURE HIGH |
| PHASE 2 OF FREEZE CYCLE | ||||
|
|
|
|
|
|
| |
Fig./ABB 5 |
|
|
| Fig./ABB 6 |
|
| |
|
| DEFROST CYCLE |
|
|
| BIN FULL | |
|
|
|
|
|
|
| |
Fig./ABB 7 |
|
|
| Fig./ABB 8 |
|
| |
|
| STAND BY |
|
|
| CLEANING | |
|
|
|
|
|
|
| |
(A) | COMPRESSOR | (G) | DP SWITCH | (O) | WATER INLET VALVE | ||
(B) | ICE LEVEL SENSOR | (H) | ELECTRIC TIMER | (P) | HOT GAS VALVE | ||
(C) | SENSORS | (I) | MICRO PROCESSOR | (Q) | CONTRACTOR COIL | ||
(D) | EVAP. TEMPERATURE | (L) | TRANSFORMER | (R) | FAN MOTOR | ||
(E) | COND. TEMPERATURE | (M) | RELAY | (S) | WATER PUMP | ||
(F) | AMBIENT TEMP. | (N) | TRIAC | (T) | P.C. BOARD |
20