1-4. Basic System Installation
Perform the following steps to install your system.
•Take the monitor out of the packaging box.
•Place the monitor where you would like to install it. Do not turn on power until installation is complete
•Choose the place where you want to install the camera.
•Once the monitor and camera locations have been chosen, install the camera.
•Connect the cable to the jack on the back of the camera.
•Connect the other end to CAMERA IN on the back of the monitor.
(At this time, select the numbers and sequence of cameras.)
•Connect the camera you wish to install (as shown below).
•Connect the power cord between the monitor and the power outlet.
•When the Power switch on the front panel of the monitor is pressed, the equipment becomes operational.
(Initially quad screen will be displayed.)
✳After the power has been turned on, the CRT needs approximately 20 seconds of stabilization period.
✳The output signal of each camera can be used as an external input for another device.
✳Connect an alarm cable between the Alarm jack and a VCR. (Alarm line: gray, Reset line: brown, GND: black)
19