Royal Consumer Information Products G20 manual Installation Using a 5 Diameter Metal Flue BOX

Page 13

INSTALLATION USING A 5" DIAMETER METAL FLUE BOX

Important: The Flue restrictor plate must be removed see Fig 10.

When the metal flue box is to be built-in as a false chimneybreast using timber stud work with plasterboard facing, the flue box should be enveloped with insulation material such as rockwool or similar to prevent a build up of heat within the structure. An air gap of 75mm should be maintained between any combustible materials and any part of the flue box or 25mm of insulation between the flue box and the combustible material.

It is important that both the back panel and the appliance are sealed to the gas flue to prevent any leakage of flue products, or reduction in the flue draught.

Page 6

Image 13
Contents 52$/&+/71+$0 Important Notes DescriptionLocation of Combustible Shelves Above Fire Side of Fire Technical DataTo Light Appliance see Fig Dismantling the Fire BED for Cleaning see , 4 Coal Laying Instructions Spares and Service Cleaning the Front of the Appliance and Cleaning the WindowShort Parts List Registration Record Installation and Servicing Instructions Description Contents Check List Installation Regulations and RequirementsFire Surround and Opening Requirements Page Page Important The Flue restrictor plate must be removed see Fig Installation Using a 5 Diameter Metal Flue BOXDismantling the Appliance Prior to Installation Installation of the ApplianceInstalling the Appliance in Position Option aLaying the Fire BED Option bPage Page Page Page Page Spillage Check Checking Operation of FireAdvise That Removal of Debris or Soot Deposit Maintenance and Servicing GeneralPage Description