Hearth and Home Technologies HST-42D owner manual TS345/TS345P Square Termination Cap

Page 35

TS345/TS345P Square Termination Cap

Termination Cap

Collar

2 in. (51 mm)

Minimum Height

Chase Top

Chimney

Pipe

Place waterproof sealer under each flange of the termina- tion cap and on top of each screw to help prevent leaks.

3 in. (76 mm)

Maximum

top of chase to top of

chimney section

Chase

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm).

Figure 9.7 Installing a TS345/TS345P Square Termination Cap

TCT375 Terra Cotta Cap

Collar

2 in. (51 mm)

Minimum Height

Chase Top

Place waterproof sealer under each flange of the termina- tion cap and on top of each screw to help prevent leaks.

Termination Cap

The last section of pipe must stop between 2 in. (51 mm) above top of chase and 7 in. (178 mm) below top of chase

2 in. (51 mm)

7 in. (178 mm)

Chase

Chimney

Pipe

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm)

Figure 9.8 Installing a TCT375 Terra Cotta Cap

Heat & Glo • HST-42D • 27177 • Rev AB • 11/08

35

Image 35
Contents Fire Risk Wood Burning FireplaceHot screen/mesh and glass doors will cause burns Number Listing Label Information/LocationGrate User Guide Table of ContentsInstaller Guide CONDITIONS, Exclusions & Limitation of Liability Warranty Hearth & Home Technologies Limited WarrantyHeat & Glo HST-42D 27177 Rev AB 11/08 Combustible Materials Listing and Code ApprovalsAppliance Certification Non-Combustible MaterialsHot glass will cause burns Operating InstructionsYour Fireplace Firescreen Seasoned WoodStarting a Fire GrateOptional Components Glass DoorsOutside Air optional Vented Gas Log Sets & Gas Log LightersWood Fuel Creosote Formation and Need for Removal Maintainance and ServiceChimney Inspection/Cleaning Disposal of AshesFrequency As desired Glass CleaningCheck Firebox Refractory Inspect GrateStart Fire Problems Possible Cause Solution Troubleshooting GuideTypical Fireplace System Getting StartedNegative Pressure Design and Installation ConsiderationsDraft Frequently open doors Central heat outlets or returns Locating Fireplace & ChimneyInspect Fireplace and Components Tools and Supplies NeededFireplace System Requirements Select Fireplace Location Framing & ClearancesClearances to Combustible Materials ClearancesFrame the Fireplace Sidewalls/SurroundsPlace Protective Metal Hearth Strips Installation of FireplaceThings to Consider Position the FireplaceFt min. from top of uppermost chimney section to air inlet AK14/AK18 Installation Install Outside Air KitChimney Assembly Meters Chimney RequirementsExample Using Offsets/ReturnsAssemble Chimney Sections Install Chimney Air KitInstalling the Ceiling Firestop Install Ceiling FirestopsPrepare Attic Insulation Shield Install Attic Insulation ShieldCut out Hole in Roof Complete InstallationInstall Flashing Following steps should be skipped if using a chaseFlat Roofs Chimney Termination RequirementsConstruct the Chase Chase InstallationsInstall Chase Top Install Fireplace & ChimneyST375 Square Termination Cap Install Termination CapTS345/TS345P Square Termination Cap Open Top Shroud TR342 caps require radiation shield ShroudsRadiation Shield Field Constructed ShroudsRoofed Style Shroud radiation shield required Mailbox Style Shroud radiation shield required= 1/k x inches of thickness FinishingHearth Extension Noncombustible Facing Finishing MaterialClearances to Mantels or other Combustibles above Fireplace Combustible MantelSquares Gas Code, Ansi Z223.1 AccessoriesGas Log/Lighter Provision Wood Burning InsertsReference Materials Fireplace DimensionsCatalog # Chimney Components14-1/2 10-7/8 276 mm HST-42D Service PartsDo not Discard this Manual