Desa (V)K36EN SERIES Location of Termination Cap, Termination CAP AIR Supply Inlet GAS Meter

Page 6

Location of Termination Cap

D

E V

B L

 

C

 

 

Fixed

V

 

Closed

 

 

F

Openable

 

V

 

 

B

 

B

Openable

B

Fixed

Closed

H

V

B

I

V J XG

AM

NN

 

G

 

V

 

G

V K X

V

A

V TERMINATION CAP

X AIR SUPPLY INLET

G

GAS METER

RESTRICTED AREA (TERMINATION PROHIBITED)

A= clearance above grade, veranda, porch, deck, or balcony [*12" (30.5 cm) minimum]

B= clearance to window or door that may be opened

[12" (30.5 cm) minimum]

C = clearance to permanently closed window [minimum 12" (30.5 cm) recommended to prevent condensation on window]

D = vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 24" (61cm) from the center-line of the terminal [18" (45.7 cm) minimum]

E= clearance to unventilated soffit [12" (30.5 cm) minimum]

F= clearance to outside corner (see below)

G= clearance to inside corner (see below)

H= *not to be installed above a meter/regulator assembly within 36" (91.4 cm) horizontally from the center-line of the regulator

I= clearance to service regulator vent outlet [*72" (182.9 cm) minimum]

J= clearance to non-mechanical air supply inlet to building or the combustion air inlet to any other fireplace [*12" (30.5 cm) minimum]

K= clearance to a mechanical air supply inlet [*72" (182.9 cm) minimum]

L= † clearance above paved side-walk or a paved driveway located on public property [*84" (213.3 cm) minimum]

M= clearance under veranda, porch, deck [*12" (30.5 cm) minimum ‡]

N= clearance above a roof shall extend a minimum of 24" (61 cm) above the highest point when it passes through the roof surface and any other obstruction within a horizontal distance of 18" (45.7 cm)

vent shall not terminate directly above a side-walk or paved driveway which is located between two single family dwellings and serves both dwellings*

only permitted if veranda, porch, deck or balconey is fully open on a minimum of 2 sides beneath the floor* * as specified in CAN/CSA B149 (.1 or .2) Installation Codes (1991) for Canada and U.S.A.

Note: Local codes or regulations may require different clearances

Termination Clearances for Buildings with Combustible and Noncombustible Exteriors

Inside Corner

Outside Corner

Recessed Location

A

A = 6" (15.2 cm)

V

V

B

 

B = 6" (15.2 cm)

 

 

D

C

C

E

V

Balcony with No Side Wall

G

V

G = 12" (30.5 cm) minimum clearance

Balcony with Perpendicular Side Wall

H

V

J

Combustible &

Noncombustible

H = 24" (61 cm)

J = 20" (50.8 cm)

C = Maximum depth of 48" (121.9 cm) for recessed location

D = Minimum width for back wall of recessed location - Combustible - 38" (96.5 cm) Noncombustible - 24" (61cm)

E = Clearance from corner in recessed location- Combustible - 6" (15.2 cm) Noncombustible - 2" (5.1 cm)

Figure 7 - Minimum Clearances for Termination Cap

www.desatech.com

111924-01D

Image 6
Contents For Your Safety What to do if YOU Smell GASTable of Contents Safety InformationProduct Features Product IdentificationLocal Codes Pre-Installation Preparation Location and space requirementsClearances Framing Clearances for Installation Against an Exterior Wall Framing and finishingLocation of Termination Cap Termination CAP AIR Supply Inlet GAS MeterInstallation Planning Venting Installation InstructionsInstallation Precautions Horizontal Termination InstallationVent Pipe Connections Vent pipe before connecting horizontal run to vent cap see Horizontal Termination Configurations Ground Floor InstallationSnorkel Termination Installation Venting with Two 90 ElbowsFlat Ceiling Installation Offset with Wall Strap and 45 ElbowsVertical Termination Configurations Vertical VentingParts lists for venting kits and components Fireplace InstallationHigh Altitude Installation Installing optional blower accessoriesModel BKT Installation Attaching Speed Control to FireboxInstalling Gas Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Pressure Testing Gas Supply Piping System Connecting Fireplace to GAS SupplyInstallation Items Needed Checking GAS ConnectionsRemoving Louver Panels Pressure Testing Fireplace Gas ConnectionsRemoving/Replacing Glass Door Test Pressures Equal To or Less Than 1/2 Psig 3.5 kPaUnplug fireplace. Let cool before installing brick liner Installing Optional Brick liner Models BL36DASA, BL36DHASACleaning Glass Door Removing Glass DoorInstalling logs, lava rock and glowing embers Wall Switch InstallationOptional Remote control Installation model WRC Wiring Diagram LineOperating Fireplace To Turn OFF GASOptional Remote Operation Inspecting Burners Cleaning MaintenancePilot assembly Burner Flame PatternPilot and burners LogsVenting system Troubleshooting To clean pilot. This can damage pilot unitGas leak. See Warning statement at Top aboveTechnical Service Replacement PartsService Hints SpecificationsIllustrated Parts Breakdown Models VK36EN, VK36ENH, Vk36ep and vk36ephParts List Parts Available not ShownBurner Assembly Models VK36EN, VK36ENH, Vk36ep and vk36eph Parts List Accessories 111924-01D Warranty Information Keep this Warrant