Bretford LAP24EBA manual Detail C

Page 30

notch

tab

Step 9

Reinstall the 3 interior shelves as follows:

1.Carefully slide in the shelf with notch at the bottom position (the notch will rest on the bracket tab). (Make sure that the shelf flanges are ALL seated into the mounting tabs.)

2.Slide in remaining 2 shelves into position as the bottom shelf.

DETAIL 'C'

Adjust timer to current time when installation is complete and ready to be plugged back into power source. If necessary, adjust tabs for charging times.

Step 10

Reinstall 6 screws to rear panel that will secure the 3 interior shelves (see DETAIL 'C'). DO NOT OVER TIGHTEN SCREWS.

timer power cord

Image 30
Contents LAP24EBA LAP24EFR Unit Repositioning Front to RearDetail B Detail C Detail D Cutout window Clip-rear Detail E Unit Repositioning Rear to Front Front View Rear-left Rear-right Detail F Offset Clip Unit Replacement Rear Location Front View Detail D Cutout window Clip-rear Round cutout Detail E Unit Replacement Front Location Bracket assembly Clip Offset Front-left Clip Front-right Bottom shelf Timer Installation E-UNIT AT Rear Location Step Filler bracket Bracket Unit cord Timer cord Bottom flange Timer/bracket See Detail C. do not Over Tighten Screws Timer Installation E-UNIT AT Front Location Front-left Front-right Detail B Bottom flange- timer/bracket Step Detail C Bottom shelf Offset Front-left Front-right Clip Label Installation PAD Lock Door Be Sure to Record Your Combination