17
Propane Only
3. Propane Tank Ring Installation
Insert propane tank ring into slots in bottom of shelf as shown. Fold tabs over to secure in place.
4 x | 3/8”(10mm) |
4. Left and Right Cart Panel Installation
Install end cart panels ensuring slots in panel are to the top, rest panel on bottom shelf and line up holes. Fasten using
(4) #14 x 1/2” screws.
www.napoleongrills.com