Heat & Glo LifeStyle
OGL-42-NG, OGL-42-LP
operating instructions
OGL-42 Installation Instructions
Troubleshooting
Install
Service Parts List
Maintenance
Log Placement
Page 12
OGL-42
INSTALLATION INSTRUCTIONS
12
4036-903
Rev C
01/04
Page 11
Page 12
Image 12
Page 11
Page 12
Contents
Installation & Operating Instructions
Table of Contents
Listings and Code Approvals
This page left blank intentionally
Service Parts List
#!5/67
Installation of the LOG SET
Gas Line and Valve Assembly Installation
Grate Assembly and Fiber Ash Bed
Connect Lines to Valve
Log Placement
Lava Rock
Lighting Instructions for the S Series
Maintenance Instructions
Troubleshooting S Series
Symptoms Possible Causes Corrective Action
OGL-42 Installation Instructions
Related pages
All Install page
What steps are involved in setting up auto local time on
Topfield TF 6000 PVR
?
Top
Page
Image
Contents