Desa (V)KC42P Horizontal System Installation Using TWO Elbows, Venting with Two 90 Elbows

Page 12

12

VENTING INSTALLATION INSTRUCTIONS

Installation Planning (Cont.)

VENTING INSTALLATION

INSTRUCTIONS

Continued

HORIZONTAL SYSTEM INSTALLATION USING TWO 90°

ELBOWS

The following configurations show the minimum vertical rise re- quirements for a horizontal system using two 90° elbows.

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1)

Horizontal (H1) +

 

 

 

Horizontal (H2)

45° Elbow

5' min.

2' max.

6' max.

 

6' min.

4' max.

12' max.

 

7' min.

6' max.

18' max.

 

8' min.

8' max.

20' max.

 

20' max.

8' max.

20' max.

 

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1) +

 

Horizontal (H2)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

20' max.

20' max.

45° Elbow

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows with Termination at 90° with Fireplace

www.desatech.com

116239-01A

Image 12
Contents For Your Safety For Your Safety What to do if YOU Smell GASSave this manual for future reference Table of Contents Safety InformationProduct Identification Local CodesProduct Features PRE-INSTALLATION PreparationLocation and Space Requirements Clearances Framing and FinishingLocation of Termination CAP Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Siding Standoff Combustible Horizontal Termination Configurations Vertical Horizontal HCorner Installation Horizontal System Installation Using TWO Elbows Venting with Two 90 ElbowsInstallation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations Venting with One 90 ElbowHigh Altitude Installation Vertical VentingVenting Installation Fireplace InstallationInstalling Optional Blower Accessories Check GAS TypeModel BKT Installation Blower see FigureInstalling GAS Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Connecting Fireplace to GAS Supply Checking GAS ConnectionsOr servicing. Correct all leaks at once Installing Optional Wall Mount Switch GWMS2 Pressure Testing Fireplace Gas ConnectionsInstalling Remote Receiver REMOVING/REPLACING Glass DoorRemoving Louver Panels Installing Lava Rock and Glowing Embers Cleaning Glass DoorRemoving Glass Door Installing Brick Liner Models BL42DASA and BL42 Dhasa For Your Safety Read Before LightingOperating Fireplace Lighting InstructionsManual Lighting Procedure To Turn OFF GASTo Appliance Optional HAND-HELD Remote OperationSafety Features Manual ModeAuto Thermostatic Mode ON/OFF Series Model GhrcbOperating Optional Blower Accessory Pilot AssemblyInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatCleaning and Maintenance Glass DoorPilot and Burners LogsTroubleshooting Observed Problem Possible Cause RemedyInlet gas pressure is too low Gas leak. See Warning statement AboveReplacement Parts Service HintsTechnical Service SpecificationsIllustrated Parts Breakdown Models KC42N, KC42P, VKC42N and VKC42P SeriesParts List KEY Part Number Description QTYTpth TP TH Parts List Accessories Owners Registration Form Postage Required 116239-01A Warranty Information