Desa (V)VC36PE SERIES, (V)VC36NE SERIES Installing Gas Piping to Fireplace Location

Page 21

Fireplace

Installation

Continued

7.Check to make sure that the power cord is com- pletely clear of the blower wheel and that there are no other foreign objects in blower wheel. Also double check all wire leads and make sure wire routing is not pinched or in a precarious position. Correct accordingly.

8.Turn on power to duplex outlet if previously turned off per the warning in column 1 on page 19.

9.Plug in blower power cord to duplex outlet.

10.The blower will only run when the speed control knob is in the ON position and the thermal switch senses temperature after the fireplace begins to heat up. The blower speed can be adjusted by rotating the control knob. To turn off, turn knob fully counterclockwise until it clicks off. If the blower is ON and has been running with the fireplace operating, the blower will continue to run for a short time after the fireplace has been turned off. As the thermal switch cools down, the blower shuts down automatically.

11.Peel off the backing paper and stick the sup- plied wiring diagram decal on the firebox bot- tom approximately 12" in front of the blower (see Figure 27, page 20).

Blower Wiring Diagram

CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dan- gerous operation. Verify proper operation after servicing.

 

 

 

Variable

Fan Switch

 

 

Fan Switch

 

 

 

 

(N.O.)

 

 

Off

1

Black

 

 

 

2

110/115

On

 

Blue

 

 

 

V.A.C. Black

 

Blower

 

 

 

 

 

 

White

 

Motor

Green

Figure 29 - Blower Wiring Diagram for

Thermostat-Controlled Models

Installing Gas Piping to Fireplace Location

WARNING: A qualified service person must connect fireplace to gas supply. Follow all local codes.

CAUTION: For propane/LP units, never connect fireplace di- rectly to the propane/LP supply. This heater requires an external regulator (not supplied). Install the external regulator between the fireplace and propane/LP supply.

WARNING: For natural gas, never connect heater to private (non-utility) gas wells. This gas is commonly known as well- head gas.

Installation Items Needed

Before installing fireplace, make sure you have the items listed below.

external regulator (supplied by installer)

piping (check local codes)

sealant (resistant to propane/LP gas)

equipment shutoff valve *

test gauge connection *

sediment trap

tee joint

pipe wrench

approved flexible gas line with gas connector (if allowed by local codes)

*A CSA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable alterna- tive to test gauge connection. Purchase the CSA design-certified equipment shutoff valve from your retailer.

For propane/LP connection only, the installer must supply an external regulator. The external regulator will reduce incoming gas pressure. You must reduce incoming gas pressure to between 11 and 14 inches of water. If you do not reduce incoming gas pressure, fireplace regulator dam- age could occur. Install external regulator with the vent pointing down as shown in Figure 30, page 22. Pointing the vent down protects it from freezing rain or sleet.

116235-01G

www.desatech.com

21

Image 21
Contents Patent Pending What to do if YOU Smell GASSafety Information Table of ContentsSafety information Product Identification Local CodesHigh traffic areas Product Features Pre-Installation PreparationLocation and space requirements Clearances Framing and finishingFor specific venting Clearances for Combustible Mantels Termination CAP AIR Supply Inlet GAS Meter Location of Termination CapInstallation Precautions Venting Installation InstructionsInstallation Planning Installing Horizontal Vent Cap Noncombustible Exterior Round Termination Square TerminationRecommended Applications Corner ground floor installation Corner InstallationHorizontal System Installation Using TWO 90 Elbows Installation for vertical termination Flat Ceiling InstallationConnect a section of pipe and extend up through the hole Twist-lock the vent cap onto the last section of vent pipe Vertical Venting High Altitude InstallationDesa 5/8 Pipe & Vent Kits Number Description Parts list for venting kits and componentsInstalling optional blower accessories Fireplace InstallationModel BK Installation Plug in blower power cordBlower Model BKT Model BKT InstallationInstalling Gas Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Propane/LP Supply TankExternal Regulator Vent Pointing Down Connecting Fireplace to GAS SupplyTest Pressures Equal To or Less Than Psig 3.5 kPa Checking GAS ConnectionsClose equipment shutoff valve see Figure Disconnect fireplace and its individual equipRemoving/Replacing Glass Door Pressure Testing Fireplace Gas ConnectionsRemoving Louver Panels Removing Glass DoorInstalling lava rock and glowing embers Installing Brick liner Models BL36DASA and BL36DHASACleaning Glass Door Wall Switch Installation Optional Remote control Installation model WRCClose top and bottom louvers Pilot Wiring DiagramOperating Fireplace For your safety Read before lightingLighting Instructions To Turn OFF GAS To AppliancePilot Assembly Operating optional blower accessoryInspecting Burners Optional Remote OperationGlass Door Cleaning MaintenancePilot and burners LogsTroubleshooting Observed Problem Possible Cause RemedyVenting system Ule And/or check ground wire to Check wiring connectionNo gas to burner, although wall Wall switch wires defective Pilot will not stay litStatement at top Gas leak. See WarningService Hints Replacement PartsTechnical Service SpecificationsAccessories Models VC36NE, VVC36NE, VC36PE and VVC36PE series Illustrated Parts BreakdownParts List 193 2827 116235-01G Burner Pan Assembly Warranty Information Keep this WarrantyLimited Warranty DIRECT-VENT Fireplace