Desa (V)VC36PE SERIES, (V)VC36NE SERIES installation manual Clearances for Combustible Mantels

Page 7

Pre-Installation

Preparation

Continued

36 1/8"

41 1/4"

21" Horizontal Vent

24 1/2" Vertical Vent

Figure 4 - Framing Clearances for Installation Against an Exterior Wall

15"

D 3 8

49C 5/8"

10 / "

 

353/4"

E

133/4"

 

 

 

 

 

 

 

41"F

 

 

 

Nailing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

41 /4"

 

 

Nailing Ta

 

 

681/2"

 

Tabs

 

 

 

 

Figure 5 - Framing Clearances for Corner

Installation

 

1

 

 

2

 

A

3

 

4

Wall

 

 

 

B

5

 

C

6

 

D E

 

7

 

F

G

 

Top of Louver

Opening

 

 

 

Mantel from

 

Mantel

 

Top of Louver

Ref.

Depth

Ref.

Opening

 

 

 

 

1

14"

A

16"

 

 

 

 

2

12"

B

14"

 

 

 

 

3

10"

C

12"

 

 

 

 

4

8"

D

10"

 

 

 

 

5

6"

E

8"

 

 

 

 

6

4"

F

6"

 

 

 

 

7

2"

G

4"

 

 

 

 

Figure 6 - Clearances for Combustible

Mantels

116235-01Gwww.desatech.com

Image 7
Contents Patent Pending What to do if YOU Smell GASSafety Information Table of ContentsSafety information Local Codes Product IdentificationHigh traffic areas Pre-Installation Preparation Product FeaturesLocation and space requirements Framing and finishing ClearancesFor specific venting Clearances for Combustible Mantels Termination CAP AIR Supply Inlet GAS Meter Location of Termination CapInstallation Precautions Venting Installation InstructionsInstallation Planning Installing Horizontal Vent Cap Noncombustible Exterior Round Termination Square TerminationRecommended Applications Corner ground floor installation Corner InstallationHorizontal System Installation Using TWO 90 Elbows Flat Ceiling Installation Installation for vertical terminationConnect a section of pipe and extend up through the hole Twist-lock the vent cap onto the last section of vent pipe Vertical Venting High Altitude InstallationDesa 5/8 Pipe & Vent Kits Number Description Parts list for venting kits and componentsPlug in blower power cord Fireplace InstallationInstalling optional blower accessories Model BK InstallationBlower Model BKT Model BKT InstallationBlower Wiring Diagram Installing Gas Piping to Fireplace LocationInstallation Items Needed Propane/LP Supply TankExternal Regulator Vent Pointing Down Connecting Fireplace to GAS SupplyDisconnect fireplace and its individual equip Checking GAS ConnectionsTest Pressures Equal To or Less Than Psig 3.5 kPa Close equipment shutoff valve see FigureRemoving Glass Door Pressure Testing Fireplace Gas ConnectionsRemoving/Replacing Glass Door Removing Louver PanelsInstalling Brick liner Models BL36DASA and BL36DHASA Installing lava rock and glowing embersCleaning Glass Door Optional Remote control Installation model WRC Wall Switch InstallationClose top and bottom louvers Pilot Wiring DiagramTo Turn OFF GAS To Appliance For your safety Read before lightingOperating Fireplace Lighting InstructionsOptional Remote Operation Operating optional blower accessoryPilot Assembly Inspecting BurnersLogs Cleaning MaintenanceGlass Door Pilot and burnersObserved Problem Possible Cause Remedy TroubleshootingVenting system Pilot will not stay lit Check wiring connectionUle And/or check ground wire to No gas to burner, although wall Wall switch wires defectiveStatement at top Gas leak. See WarningSpecifications Replacement PartsService Hints Technical ServiceAccessories Models VC36NE, VVC36NE, VC36PE and VVC36PE series Illustrated Parts BreakdownParts List 193 2827 116235-01G Burner Pan Assembly Keep this Warranty Warranty InformationLimited Warranty DIRECT-VENT Fireplace