Desa (V)VC42NE Series, (V)VC42PE Series installation manual Installation Planning

Page 8

8

VENTING INSTALLATION INSTRUCTIONS Installation Planning

VENTING INSTALLATION INSTRUCTIONS

Continued

INSTALLATION PLANNING

There are two basic types of direct-vent installation:

Horizontal Termination

Vertical Termination

Horizontal Termination Installation

IMPORTANT: Horizontal square terminations require only in- ner portion of wall firestop. Horizontal installations using round termination require exterior portion of wall firestop (see Figure 14, page 10).

1.Set the fireplace in its desired location and determine the route your horizontal venting will take. Do not secure the fireplace until all venting has been installed. Some installations require sliding the fireplace in and out of position to make final vent- ing connections. Figures 14 through 18 on pages 10 through 12 show different configurations for venting with horizontal termination that will help you decide which application best suits your installation. Check to see if wall studs or roof rafters are in the path of your desired venting route. If they are, you may want to adjust the location of the fireplace.

2.Direct vent pipe sections and components are designed with special twist-lock connections.

Twist-Lock Procedure: The female ends of the pipes have locking lugs (indentations). These lugs will slide straight into matching slots on the male ends of adjacent pipes. Push pipe sections together and twist one section clockwise approxi- mately one-quarter turn until the sections are fully locked (see Figure 8). Note: Horizontal runs of vent must be supported every three feet. Use wall straps for this purpose.

3.Use a 45° elbow to connect venting system to fireplace flue collar. The elbow is designed to be twist-locked onto the flue collar as described in step 2. IMPORTANT: Do not attempt to alter the configuration of the elbow by cutting, twisting, bending, etc.

4.Assemble the desired combination of pipe and elbows to the fireplace flue collar. If there are long portions of venting run, pre-assembled pipe sections may be installed as subassemblies for convenience.

5.Carefully determine the location where the vent pipe assembly will penetrate the outside wall. The center of the hole should line up with the center-line of the horizontal vent pipe. Mark the wall for a 10 3/4" x 10 3/4" square hole. Cut and frame the square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, such as masonry block or concrete, a 8 1/2" hole with zero clearance is acceptable (see Figure 9).

Male

Female Slots

Locking

Lugs

Figure 8 - Vent Pipe Connections

Vent Opening

 

Combustible Wall

10 3/4" Inside Framing

10 3/4"

(273 mm)

(273 mm)

 

10 3/4"

 

(273 mm)

 

(Framing

Vent Opening

Detail)

 

Noncombustible Wall

 

8 1/2"

 

(216 mm)

 

 

Center

 

of Hole

Figure 9 - Vent Opening Requirements

www.desatech.com

116237-01D

Image 8
Contents For Your Safety For Your Safety What to do if YOU Smell GASTable of Contents Safety InformationSafety Information Product Identification Local CodesLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Clearances Framing and FinishingLocation of Termination CAP Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Horizontal Vent Cap Noncombustible Exterior Venting Installation Instructions Horizontal Termination ConfigurationsCorner Installation Venting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations Vertical V Horizontal H Min Max 12 max 18 max 20 maxHigh Altitude Installation Venting Installation Fireplace Installation Check GAS TypeInstalling Optional Blower Accessory Desa 5/8 Pipe & Vent KitsFireplace Installation Model BKT InstallationInstallation Items Needed Installing GAS Piping to Fireplace LocationBlower Wiring Diagram Checking GAS Connections Connecting Fireplace to GAS SupplyPressure Testing Gas Supply Piping System Removing Louver Panels Pressure Testing Fireplace Gas ConnectionsREMOVING/REPLACING Glass Door Removing Glass Door Installing Lava Rock and Glowing EmbersCleaning Glass Door Optional Remote Control Installation Model WRC Installing Brick Liner Models BL42DASA and BL42DHASAWall Switch Installation Lighting Instructions Wiring DiagramOperating Fireplace Operating Optional Blower Accessory To Turn OFF GAS To ApplianceOptional Remote OperationCleaning Maintenance Glass DoorPilot and Burners LogsTroubleshooting Observed Problem Possible Cause RemedyGas leak. See Warning statement at Replacement Parts Service HintsTechnical Service Parts Under WarrantySpecifications Illustrated Parts Breakdown Models VC42NE, VC42PE, VVC42NE and VVC42PEParts List KEY Part Number Description QTY2827 19 18 116237-01D KEY Part Number Description Accessories Owners Registration Form Postage Required 116237-01D Warranty Information Keep this Warranty

(V)VC42NE Series, (V)VC42PE Series specifications

The Desa (V)VC42NE Series and (V)VC42PE Series are advanced heating systems designed for residential and commercial applications. These models offer a unique combination of efficiency, performance, and user-friendly features, catering to diverse heating needs.

One of the standout features of both series is their exceptional energy efficiency. Utilizing cutting-edge technology, these heating solutions provide substantial savings on energy costs while minimizing environmental impact. The (V)VC42NE Series is particularly known for its low emissions, adhering to strict environmental regulations and contributing to cleaner air quality.

In terms of technology, the series incorporates innovative heating design and advanced materials. The high-efficiency burners ensure maximum heat output with minimal fuel consumption. Furthermore, the built-in diagnostics make it easy for homeowners and technicians to monitor performance and troubleshoot any issues that may arise, ensuring consistent and reliable operation over time.

The (V)VC42NE and (V)VC42PE models are equipped with user-friendly control systems. The intuitive interface allows users to set and adjust temperatures with ease, making it accessible for everyone. Additionally, these systems support programmable settings, enabling users to customize their heating schedules based on their lifestyle and preferences, thereby enhancing comfort and convenience.

Another essential characteristic of these series is their versatility in installation. With options for both vented and unvented configurations, users can choose the system that best fits their space and requirements. This flexibility allows for seamless integration into various environments, whether in homes, offices, or commercial establishments.

Safety is also a paramount focus in the design of the (V)VC42NE and (V)VC42PE Series. Built-in safety features, including flame failure devices and overheat protection, offer peace of mind to users by minimizing the risk of accidents.

Lastly, the sleek and modern appearance of these heating solutions ensures that they complement any décor. Their durable construction guarantees longevity, making the Desa series a reliable investment for those seeking effective heating solutions. In summary, the Desa (V)VC42NE Series and (V)VC42PE Series provide a potent combination of efficiency, safety, and user-friendly features, making them ideal choices for anyone in need of a dependable heating system.