Desa (V)V42ENA(1) Series, (V)V42EPA(1) Series Vertical Termination Configurations

Page 14

14

VENTING INSTALLATION INSTRUCTIONS

Installation for Vertical Termination (Cont.)

VENTING INSTALLATION INSTRUCTIONS

Continued

Vertical Termination Configurations

Figures 21 through 24 show four different configurations for verti- cal termination.

Venting with Two 90° Elbows

Vertical (V) Horizontal (H1) +

Horizontal (H2)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

 

Note: Install

45° Elbow

restrictor into inner

collar of fireplace

 

as shown.

Venting with One 90° Elbow

Vertical (V)

Horizontal (H)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

45° Elbow

Note: Install restrictor

 

into inner collar of

 

fireplace as shown.

Figure 22 - Vertical Venting Configuration Using One 90° Elbow

(Vertical Round High Wind Termination Shown)

Venting with Two 90° Elbows

Vertical (V1)

Horizontal (H)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

Figure 21 - Vertical Venting Configuration Using Two 90° Elbows with Two Horizontal Runs (Vertical Round High Wind Termination Shown)

Note: Install restrictor into inner collar of fireplace as shown.

45° Elbow

Note: Vertical (V1) + Vertical (V2) = 40' max.

Figure 23 - Vertical Venting Configuration Using Two 90° Elbows

(Vertical Round High Wind Termination Shown)

For..com

111907-01C

Image 14 Contents
For Your Safety What to do if YOU Smell GAS OWNER’S Operation Installation ManualFor Your Safety Table of Contents Safety InformationProduct Identification Local CodesLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Clearances Framing and FinishingLocation of Termination CAP Balcony with Perpendicular Side WallVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Horizontal Vent Cap Noncombustible Exterior Horizontal Termination Configurations Ground Floor Installation Corner Installation Venting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations High Altitude Installation Number DescriptionCheck GAS Type Fireplace InstallationInstalling Optional Blower Accessory Attaching Speed Control to Firebox Model BKT Installation Blower Wiring DiagramInstalling GAS Piping to Fireplace Location Installation Items NeededPressure Testing Gas Supply Piping System Connecting Fireplace to GAS SupplyInstallation Items Needed Checking GAS ConnectionsREMOVING/REPLACING Glass Door Pressure Testing Fireplace Gas ConnectionsCleaning Glass Door Removing Louver PanelsInstalling Optional Brick Liner Models BL42DASA, BL42DHASA Installing LOGS, Lava Rock and Glowing EmbersInstalling Log No and Log No Optional Remote Control Wiring DiagramWall Switch Installation Lighting Instructions For Your Safety Read Before LightingOperating Fireplace To Turn OFF GAS To ApplianceInspecting Burners Operating Optional Blower AccessoryPilot Assembly Burner Flame PatternPilot and Burners Cleaning MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible Cause RemedyObserved Problem Possible Cause Illustrated Parts Breakdown ModelsParts List Description QTYBurner Assembly for Models VV42ENA1, VV42ENSA1 KEY Part Number Description QTY Technical Service Replacement PartsService Hints SpecificationsOwners Registration Form Postage Required Accessories Warranty Information