Desa VC42PE SERIES, VC42NE SERIES installation manual Installation Planning

Page 10

Venting Installation

instructions

Continued

INSTALLATION PLANNING

There are two basic types of direct-vent in- stallation:

Horizontal Termination

Vertical Termination

Horizontal Termination Installation IMPORTANT: Horizontal square terminations require only inner portion of wall firestop. Hori- zontal installations using round termination require exterior portion of wall firestop (see Figure 14, page 12).

1. Set the fireplace in its desired location and deter-

mine the route your horizontal venting will take.

Do not secure the fireplace until all venting has

been installed. Some installations require sliding

the fireplace in and out of position to make final

venting connections. Figures 14 through 18 on

pages 12 through 14 show different configura-

tions for venting with horizontal termination that

will help you decide which application best suits

your installation. Check to see if wall studs or

roof rafters are in the path of your desired vent-

ing route. If they are, you may want to adjust the

location of the fireplace.

2. Direct vent pipe sections and components are

designed with special twist-lock connections.

5.Carefully determine the location where the vent pipe assembly will penetrate the outside wall. The center of the hole should line up with the center-line of the horizontal vent pipe. Mark the wall for a 10 3/4" x 10 3/4" square hole. Cut and frame the square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, such as masonry block or concrete, a 8 1/2" hole with zero clearance is acceptable (see Figure 9).

Female

Male

Slots

Locking Lugs

 

Figure 8 - Vent Pipe Connections

Vent Opening

Combustible Wall 10 3/4" Inside Framing

10 3/4"(273 mm)

(273 mm)

10 3/4"

(273 mm)

(Framing

Twist-Lock Procedure: The female ends of

Vent Opening

Detail)

the pipes have locking lugs (indentations).

These lugs will slide straight into matching

slots on the male ends of adjacent pipes.

Push pipe sections together and twist one

section clockwise approximately one-quar-

ter turn until the sections are fully locked

(see Figure 8). Note: Horizontal runs of vent

must be supported every three feet. Use wall

straps for this purpose.

3. Use a 45° elbow to connect venting system

to fireplace flue collar. The elbow is designed

to be twist-locked onto the flue collar as

described in step 2. IMPORTANT: Do not

attempt to alter the configuration of the elbow

by cutting, twisting, bending, etc.

4. Assemble the desired combination of pipe and

elbows to the fireplace flue collar. If there are

long portions of venting run, pre-assembled

pipe sections may be installed as subassem-

blies for convenience.

Noncombustible Wall

8 1/2"

(216 mm)

Center of

Hole

Figure 9 - Vent Opening Requirements

10

www.desatech.com

116237-01E

Image 10
Contents What to do if YOU Smell GAS Table of Contents Safety Information Identification ProductHigh traffic areas Local Codes Product FeaturesPre-Installation Preparation Location and space requirementsFront 36 914 mm Top of Standoffs Vent See venting Clearances42 1067 mm Venting clearancesNoncombustible mantels at any height above Framing and finishingFireplace Location of Termination Cap Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsInstallation Planning Installing Horizontal Vent Cap Noncombustible Exterior Ground Floor Installation Corner Installation Recommended Applications Corner ground floor installationHorizontal System Installation Using TWO 90 Elbows Flat Ceiling Installation Installation for vertical terminationConnect a section of pipe and extend up through the hole Twist-lock the vent cap onto the last section of vent pipe High Altitude Installation Vertical VentingParts list for venting kits and components Desa 5/8 Pipe & Vent Kits Number DescriptionModel BK Installation Fireplace InstallationInstalling optional blower accessories Plug in blower power cordModel BKT Installation Blower Model BKTBlower Wiring Diagram Installing Gas Piping to Fireplace LocationInstallation Items Needed Connecting Fireplace to GAS Supply Propane/LP Supply TankExternal Regulator Vent Pointing DownClose equipment shutoff valve see Figure Checking GAS ConnectionsTest Pressures Equal To or Less Than Psig 3.5 kPa Disconnect fireplace and its individual equipRemoving Louver Panels Pressure Testing Fireplace Gas ConnectionsRemoving/Replacing Glass Door Removing Glass DoorInstalling Brick liner Models BL42DASA and BL42DHASA Installing lava rock and glowing embersCleaning Glass Door Optional Remote control Installation model WRC Wall Switch InstallationReplace top and bottom louvers Wiring Diagram Lighting Instructions For your safety Read before lightingOperating Fireplace To Turn OFF GAS To ApplianceInspecting Burners Operating optional blower accessoryPilot Assembly Optional Remote OperationPilot and burners Cleaning MaintenanceGlass Door LogsObserved Problem Possible Cause Remedy TroubleshootingVenting system No gas to burner, although wall Wall switch wires defective Check wiring connectionUle And/or check ground wire to Pilot will not stay litStatement at top Gas leak. See WarningTechnical Service Replacement PartsService Hints SpecificationsAccessories Illustrated Parts Breakdown Models VC42NE, VVC42NE, VC42PE and VVC42PEParts List 2827 19 18 Burner Pan Assembly Keep this Warranty Warranty InformationLimited Warranty DIRECT-VENT Fireplace