Vermont Casting VC3624GS owner manual Wood Box Lid Cooking Grids IncludedWood Box Rack Water Pan

Page 13

Assembly Step 8

Locate these parts:

Wood Box

& Lid

Cooking Grids

(4 included)Wood Box

Rack

Water Pan

1.Insert the 4 cooking grids into the top 4 grid rack positions.

2.Place the water pan onto the large

rack supports.

3.Insert the wood box rack into the lower most rack position.

4. Place the lid onto the wood box and set the wood box onto the wood box rack.

11

Image 13
Contents Assembly Table of Contents Read ALL Instructions and Warnings LP Tank Not Included Assembly Identifying the parts Identifying the Parts Hardware Assembly Step20 x 5/8 Bolts Remaining from previous step 20 x 1/2 Bolts Required Nuts Door Inside of Door Drip Pan Wood Box Lid Cooking Grids IncludedWood Box Rack Water Pan Hook Connecting the LP Tank Checking for Leaks Operating Instructions Pre-Use ProceduresAdding Water Cooking TipCooking Tip Flavoring Wood Adding WoodMatch Lighting Lighting Procedure Ignitor Lighting SystemShutting the Smoker Off Cooking Tip Damper AdjustmentsCooking Instructions Temperature Chart Care and Maintenance After Use Safety and MaintenanceManufacturer’s Limited Warranty