ASSEMBLY INSTRUCTIONS
|
|
|
|
| TIP: To position the left side shelf, insert the two hooks |
10 |
|
|
| ||
|
|
| on the side shelf assembly into the two openings | ||
|
|
| located on the upper left side panel (BB). | ||
|
|
| 10. Assemble the right side shelf assembly to the cart | ||
|
|
|
|
| assembly, as shown in figure B. |
|
|
| BB | * |
|
|
|
|
| #2 - ¼” - 20UNCx38 Screw (x1) | |
|
|
|
|
| |
| DA |
|
|
|
|
| A | DB |
|
| #3 - ¼” - 20UNCx16 Screw (x4) |
|
|
|
|
| |
|
|
|
|
| #4 - ø7 Lock Washer (x5) |
| * |
|
|
| |
|
|
|
|
| |
|
|
|
|
| #5 - ø7 Washer (x5) |
| B |
|
|
|
|
|
| 11. Remove the hardware that is | |
11 | |||
the side burner valve bracket(CC), as shown in | |||
figure B. Insert the side burner valve stem through | |||
|
| the rear of the left side shelf fascia(DB). Assemble | |
|
| the side burner valve to the side shelf fascia, using | |
|
| the hardware removed. | |
12 | Assemble the side burner control knob (#12) to | ||
|
| the side burner valve (CC). | |
| DA | Hardware may be included with the hardware pack. | |
|
|
DB
#12. Knob (x1)
CC
B
11