Cisco Systems 3180 Checking the Front Panel LEDs, Indicator Color State Indicates

Page 18

Chapter 3 Installing the AVS 3180

Checking the Front Panel LEDs

Checking the Front Panel LEDs

When the AVS 3180 is up and running, observe the front panel LEDs to monitor AVS 3180 operating status. Figure 3-12shows the location of front panel LEDs, and Table 3-1describes their function.

Figure 3-12 AVS 3180 Front Panel LEDs

1 3

2

4

0

1

 

 

 

 

 

 

i

119603

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

Table 3-1

Front Panel LED Indicators

 

 

 

 

 

 

 

 

 

 

Indicator

 

 

 

Color

State

Indicates

 

 

 

 

 

 

1

Power Spike

 

Blue

On

Normal operation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Blinking

A power surge has occurred

 

 

 

 

 

 

2

Ethernet 0 Link

 

Green

On

Ethernet 0 is connected to a network

 

 

 

 

 

 

 

Ethernet 0 Activity

 

Green

Blinking

An active link connection on the

 

 

 

 

 

 

 

10/100/1000BASE-T interface for Ethernet port 0

 

 

 

 

 

 

3

Ethernet 1 Link

 

Green

On

Ethernet 1 is connected to a network

 

 

 

 

 

 

 

Ethernet 1 Activity

 

Green

Blinking

An active link connection on the

 

 

 

 

 

 

 

10/100/1000BASE-T interface for Ethernet port 1

 

 

 

 

 

 

4

Hard Drive Activity

 

Green

Blinking

The hard drive is in use

 

 

 

 

 

 

 

 

5

Power

 

 

 

Green

On

The AVS 3180 is on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Blinking

The AVS 3180 is in standby mode

 

 

 

 

 

 

 

 

Cisco AVS 3180 Management Station Hardware Installation Guide

3-18

78-17292-01

 

 

Image 18
Contents Installing the AVS Installing Your AVS Unpacking and Inspecting the AVSIf the Product is Damaged Installing the AVS 3180 in a Four-Post Rack Attaching the Telescopic Rails to the Rack Assembly Removing the Inner Server Rail Attaching Front Rail to the Right Side of the Rack Telescopic Rail Adjustment Screws Attaching Back Rail to the Right Side of the Rack Attaching a Two-Post Rack Bracket to the AVS Inserting the AVS 3180 into the RackInstalling the AVS 3180 on a Workbench or Tabletop Attaching the Right Bracket to the Right Side of the AVSConnecting Cables 10 AVS 3180 Back Panel Ports and ConnectorsConnecting AC Power 11 Console ConnectionBooting the AVS Booting with a Console ConnectedEstablishing a Serial Console Connection Configuring Network Settings Velocityshow interfaceYou can view the DNS settings by using the show dns command Setting the Time Indicator Color State Indicates Checking the Front Panel LEDsRemoving or Replacing an AVS

3180 specifications

Cisco Systems 3180 is a prominent network switch designed primarily for enterprise environments that demand high performance and reliability. A part of Cisco’s Catalyst series, the 3180 combines advanced technology with robust features to deliver exceptional connectivity and management capabilities.

One of the key features of the Cisco 3180 is its ability to support both Layer 2 and Layer 3 switching. This versatility allows organizations to benefit from enhanced routing capabilities, enabling seamless communication between different network segments. The switch supports a high throughput with a robust architecture that accommodates various networking demands, making it an ideal choice for businesses that require scalability.

Security is a top priority in today's networking world, and the Cisco 3180 excels in this area. It includes advanced security protocols that help safeguard network data and prevent unauthorized access. Features like Virtual LANs (VLANs) enhance network segmentation, while access control lists (ACLs) regulate traffic flow based on specified criteria. The switch also supports the 802.1X authentication protocol, ensuring that only authorized devices can connect to the network.

The Cisco 3180 leverages Gigabit Ethernet technology, providing high-speed connectivity for multiple devices within the network. This technology supports a wide range of applications, from data-intensive tasks to real-time communications. Moreover, the switch is designed to minimize latency, ensuring quick and efficient data transmission.

For network management, the Cisco 3180 offers features such as Cisco’s Embedded Event Manager (EEM) and Cisco Prime, which provide tools for monitoring and managing network performance. These tools allow network administrators to address issues proactively, optimize resources, and maintain overall network health.

The switch is also designed with energy efficiency in mind, incorporating technologies that reduce power consumption while maintaining performance. Support for Energy Efficient Ethernet (EEE) ensures that power is used judiciously, aligning with modern sustainability initiatives.

In conclusion, the Cisco Systems 3180 is a feature-rich network switch that combines high performance, security, and efficiency. Its advanced capabilities make it a vital component for enterprises looking to enhance their networking infrastructure while preparing for future growth and technological advancements. With robust management tools and security features, the Cisco 3180 stands out as a reliable solution for modern networking challenges.