Stow 900, 2600, 1000 Vibrator HEADS-PREPARATION & Operation, See Compaction Coverage Chart, Figure

Page 8

VIBRATOR HEADS—PREPARATION & OPERATION

This safety alert symbol is used to attract your attention. Personal safety is involved. When you see this symbol, become alert; heed its message.

WARNING!

DO NOT attempt to operate this vibrator head until the Safety and Operating Instructions for the Electric Motor or Gasoline Power Unit and Flexible Shaft have been read and fully understood. Failure to do so could result in serious bodily injury and/or property damage.

WARNING!

MAKE CERTAIN the motor is disconnected from the power source and the switch is in the "OFF" position.

4.When connecting the head to the casing, clean the mating threads with an anaerobic sealant primer and allow it to air dry for several minutes. Apply a ring of anaerobic sealant (Loctite 271, Hernon 427 or equivalent), to the casing threads and screw the head tightly to the casing. Wait for one hour before using.

1.The vibrator motor, flexible shafting, and heads are shipped from the factory ready to use.

2.Use only the combination of flexible shafting and heads shown below in Table 1.

Table 1. Shaft Sizes

MODEL

SHAFT

HEAD SIZE

MAX. SHAFT

LENGTH

 

 

 

 

 

 

 

1HP

314V

900

21 FT.

SV-1, DI 1

1000

75ER

 

1300

 

 

 

 

 

 

 

1400

 

2HP

 

1700

28 FT.

SV-2, DI 2

382V

 

 

130 ER

 

 

 

 

2100

21 FT.

 

 

 

 

 

 

3HP

 

1400

 

 

1700

 

SV-3, DI3

382V

35 FT.

2100

200 ER

 

 

 

2600

 

 

 

 

 

 

 

 

3.To connect the flexible shafting to the vibrator motor see (Figure 1). (382V Shafting shown)

Figure 1. Shafting to Motor Connection

(382V Shafting Shown)

CAUTION!

The vibrator head is cooled by the concrete. Operation of the vibrator head in air longer than 2 minutes at a time will cause overheating of the bearings which will result in premature head failure.

5.See Compaction Coverage Chart, (Figure 2).

 

Figure 2. Compaction Coverage

 

 

 

with 50% Radial Overlap

 

 

 

 

 

 

 

 

 

 

Table 2. Compaction Coverage

 

 

 

 

 

 

 

 

 

 

Head

900

1000

1300

1400

1700

2100

2600

 

 

 

 

 

 

 

 

P-Dimension

4"

5-1/2"

8"

8"

12"

14"

18"

 

 

 

 

 

 

 

 

6.Immerse the head for 5 to 10 seconds, (until air stops rising), and then withdraw it slowly to let the concrete fill the void left by the head. The head should be completely below the surface when vibrating to keep the head cool. When vibrating a thin horizontal slab, the head can be used in a horizontal position.

CAUTION!

If the shaft begins to helix (buckle) excessively during operation, stop and investigate. This is an indication of an overload condition.

PAGE 8 — VIBRATOR HEADS— PARTS & OPERATION MANUAL — REV. #1 (04/22/02)

Image 8
Contents Stow Vibrator Heads Page Heres HOW to GET Help MQ Stow Vibrator Heads Vibrator HEADS- Parts Ordering Procedures UPS Third Day Service at one-half of actual freight costDo not follow directions Always wear approved eye and hearing protectionVibrator HEADS- Rules for Safe Operation Always know the location of the nearest and first aid kitSee Compaction Coverage Chart, Figure Vibrator HEADS-PREPARATION & OperationHousing Nut or ScrewBearing SpindleAllow to set one hour before use Vibrator Heads MaintenanceAssemble the lower bearings to the spindle. Ref Vibrator Heads Specifications General SpecificationsVibrator Heads Seal Installation Seal lip to face vibrator head endPage SV-SERIES Vibrator Head Assy Item no Description SV-SERIES Vibrator Head Assy Seal Terms and Conditions of Sale Page Heres HOW to GET Help