Stow 1000, 2600, 900 Housing, Nut or Screw, Bearing, Spindle, Seal, Spacer, Shim, Flat Washer, Tip

Page 9

MAINTENANCE

Reference

 

Number

Description

1

Housing

2

Nut or Screw

3

Bearing

4

Spindle

5

Seal

6

Spacer

8

Fitting Adapter

9

Casing Adapter

10

Shim

11

Flat Washer

12

Tip

VIBRATOR HEADS— MAINTENANCE

Figure 3. Head Parts

CAUTION!

DO NOT allow the vibrator head to wear below the following dimensions: See General Specifications - page11.

The vibrator heads should be inspected and lubricated after every 100 hours of use. Refer to (Figure 3).

To Disassemble a Vibrator Head:

1.Remove the flexible shaft from the head. Heat should be applied to the threads to break down the anaerobic sealant. This will help prevent possible damage to the threads. Threads are left-hand.

2.Remove the casing adapter from the housing. Head should be applied to the threads to break down the anaerobic sealant. Threads are right-hand. (Ref. 9)

3.Remove the hardened tip from the housing. Heat should be applied to the threads to break down the anaerobic sealant. Threads are right-hand. (Ref. 1,12)

VIBRATOR HEADS — PARTS & OPERATION MANUAL — REV. #1 (04/22/02) — PAGE 9

Image 9
Contents Stow Vibrator Heads Page Heres HOW to GET Help MQ Stow Vibrator Heads UPS Third Day Service at one-half of actual freight cost Vibrator HEADS- Parts Ordering ProceduresAlways wear approved eye and hearing protection Do not follow directionsAlways know the location of the nearest and first aid kit Vibrator HEADS- Rules for Safe OperationVibrator HEADS-PREPARATION & Operation See Compaction Coverage Chart, FigureNut or Screw HousingBearing SpindleVibrator Heads Maintenance Assemble the lower bearings to the spindle. RefAllow to set one hour before use General Specifications Vibrator Heads SpecificationsSeal lip to face vibrator head end Vibrator Heads Seal InstallationPage SV-SERIES Vibrator Head Assy Item no Description SV-SERIES Vibrator Head Assy Seal Terms and Conditions of Sale Page Heres HOW to GET Help