Pre-operation Inspection
RBe sure that the operator’s manual is complete, legible and in the storage container located on the machine.
RBe sure that all decals are legible and in place. See Decals section.
Check the following components or areas for damage, improperly installed or missing parts and unauthorized modifications:
RWinch and related components
RBase components
RLegs
RStabilizers and latch plates (if equipped)
RMast columns
RCarriage
RCable anchor
RCable and pulleys
RWheels and casters
RLoad handling attachments
RNuts, bolts and other fasteners
RCable (kinks, frays, abrasions)
Check the entire machine for:
RDents or damage
RCorrosion or oxidation
RCracks in welds or structural components
RBe sure that all structural and other critical components are present and all associated fasteners and pins are in place and properly tightened.
RBe sure there is a minimum of 4 wraps of cable around the winch drum when the carriage is fully lowered.