Huawei MC509 CDMA LGA manual GCF and Ptcrb Certification

Page 78

HUAWEI MC509 CDMA LGA Module

 

Hardware Guide

Certifications

Terminal manufacturers who apply for the PTCRB certification of the terminals to be integrated with Huawei modules must accomplish the following tasks:

1.Register as a guest of the PTCRB.

Different from the GCF, the PTCRB comprises of only operators. Terminal manufacturers can join the PTCRB only as guests. The terminal manufacturers who apply for the PTCRB certification have to register as PTCRB guests as they must submit the application on the PTCRB website.

2.Choose a test organization.

The PTCRB requires only qualified test organization to perform PTCRB tests. In this case, it is necessary for manufacturers to choose a well-recognized test organization that provides high quality and high efficiency services. The global test organizations 7layers, SGS, and CETCOM are recommended. The recommended test organizations have built various labs all around the world and work closely with the GCF and the PTCRB. Therefore, the test organizations are able to provide high quality and high efficiency test services and are widely recognized by operators.

3.Discuss test details with the test organization.

Provide the test organization with the test report of Huawei modules and the modifications of the integrated equipment. The test organization then can determine the detailed test items and determine the test schedule accordingly. With the detailed test items and schedule, terminal manufacturers can determine accurate plans of product development and marketing.

4.Submit an overall-system certification application on the PTCRB website and designate a test organization.

Submit a test application on the PTCRB website, indicating the basic information of the terminal to be certified. The PTCRB then transfers the application to the designated test organization. Remember to pay the CTIA after you submit a test application. Unpaid applications are rejected even though all the required tests are performed.

5.Perform overall-system certification.

The integrated equipment can pass the over-all certification test easily if Huawei's design suggestions are complied with.

6.Obtain the test report and submit relevant materials.

The PTCRB test report is provided by the test organization. The terminal manufacturer, however, is required to provide the user manual and other necessary documents of the terminal to be certified on the PTCRB website before the PTCRB test application can be approved. In addition, the PTCRB submits all the materials to the CTIA for review on completion of all the PTCRB tests. The terminal is PTCRB certified on completion of the CTIA review.

GCF and PTCRB Certification

To launch a terminal in the global market, both the GCF certification and the PTCRB certification are required. In this case, the manufacturer does not need to conduct two end-to-end tests. As the UIM test is the same for both the GCF certification and the PTCRB certification, the test organization needs to perform the UIM test only once. This practice is recognized by both the GCF and the PTCRB. The cost, including time and expense, of overall-system certification is thus reduced.

Issue 01 (2011-04-08)

Huawei Proprietary and Confidential

78

Copyright © Huawei Technologies Co., Ltd.

 

 

Image 78 Contents
Issue Date Hardware GuideNo Warranty About This Document HistoryVersion Date Chapter Descriptions Summary Chapter DetailsContent Description of the Application InterfacesElectrical and Reliability Features Safety Information Introduction Product name RF Band BandwidthAbout This Chapter Feature DescriptionOverall Description Function OverviewSMS TBDCircuit Block Diagram  Waste Electrical and Electronic Equipment DirectiveWEEEApplication Block Diagram 2Application block diagram of the MC509 moduleDescription of the Application Interfaces LGA InterfacePin Name Description DC Characteristics Normal Min Typical MaxVCCEXT1 JtagtmsVCCEXT2 UimvccMIC1P WdisableMIC2N MIC1NUartdsr Gpio Wakeupout GpioJtagtdo Uartrts GpioUartring Gpio PoweronoffUimreset Uartrx GpioSpkroutp EaroutnEaroutp SpkroutnGpsant Auxant134 132133 135Power Interface OverviewVbat Interface Vcoin Interface Sudden momentary power lossSmpl timer setting Capacitor value Capacitor package Real-time clockParameter Specifications HB-414 ML-series Output Power Supply Interface4Coin cell characteristics Uimvcc PINSignal Control Interface Pin Pin Name Description DC Characteristics Min Typical MaxInput Signal Control Pins Power-On Time Sequence 3shows the connections of the Poweronoff and Resinn pinsParameter Comments TimeNominal Units Values Parameter Comments TimeNominal values UnitsOutput Signal Control Pin TBD Wakeupin Signal Resinn6Connections of the Wakeupin and Wakeupout pins Uart InterfaceCircuit Recommended for the Uart Interface USB Interface USB data signal D+USB data signal D Pin No Pin Name Description10DC Electrical Characteristics of USB VOHmin VOLmax VIHmin VILmaxUIM Card Interface Circuit Recommended for the UIM Card InterfaceUimpwr NullAudio Interface ESD Protection for the UIM Card InterfaceAnalogue Audio DCE Pcmdin Digital AudioPcmsync PcmdouPin No Description Primary ModeGeneral Purpose I/O Interface Name Min Type MaxJtag Interface Pin No Pin Name Description DC Characteristics Min Type MaxVCCEXT2 6V Power RF Antenna InterfaceNC Pins Pin No Description DC Characteristics Name Min Typical MaxGpsant RF GPS Operating Frequencies RF SpecificationsAntenna Installation Guidelines 错误!未找到引用源。 shows the RF bands supported by MC509 RF bandsTest Environment Conducted Rx Sensitivity and Tx PowerConducted RF Measurement Test StandardsAntenna Design Requirements Conducted Transmit PowerAntenna Design Indicators Antenna EfficiencyPolarization Radiation PatternGain and Directivity Antenna for MC509 must fulfill the following requirements InterferenceCdma Antenna Requirements Cdma Antenna RequirementsRadio Test Environment Passive TestsActive Tests External power voltage Electrical and Reliability FeaturesSymbol Specification Minimum Maximum Unit Value Input voltage of standby Power for the RTC Data pin voltageSpecification Minimum Value Maximum Value Unit Working and Storage Temperatures and HumidityElectrical Features of Application Interfaces Parameter Description Minimum Value Maximum Value UnitPower Peak Maximum Normal Maximum Power Supply FeaturesInput Power Supply Parameter Minimum Typical Maximum Ripple Unit ValueWorking mode Max Unit Reliability FeaturesPower Consumption Test Condition StandardTest Condition Standard EMC and ESD Features − USBMechanical Specifications Dimensions and interfacesPCB Pad Design Label 2PCB pad designPacking System NameplateFCC CCC NCC Tick CertificationsCertification JgpssiSGS RoHS Test Environmental Protection Certification and TestRoHS Restricted Substance Density Threshold ppmWeee Product Certification National Compulsory CertificationPVC-free Importance of Product CertificationProduct Certification Classifications Certification Modes DOC Certification Types CE CertificationFCC Certification Comply with the following rules when making DGT marks NCC DGT CertificationAn example of the DGT mark Tick CertificationTelec and Jate Certification Japan  Telecom Engineer Center Telec Jate Xxxxxx is the company number issued by the IC Huawei 6369AIC Certification Canada IC XXXXXX-YYYYYYYYChinese Certifications  YyyyyyyyIssue 01 Huawei Proprietary and Confidential RoHS, REACH, JGPSSI, and Chinese Environmental Protection  CCC− PBB − Pbde Huawei MC509 Cdma LGA Module Hardware Guide Certifications Guide to Product Certification CE Certification and FCC CertificationIC Certification GCF and PtcrbGCF Certification NCC Certification Huawei MC509 Cdma LGA Module Hardware Guide Certifications Ptcrb Certification Overall-System CertificationWcdma FDD Overall-System GCF Certification Overall-System Ptcrb Certification GCF and Ptcrb Certification Medical Device Safety InformationInterference Area with Inflammables and ExplosivesAirline Security Safety of ChildrenTraffic Security Environment ProtectionEmergency Call Care and MaintenanceLaws and Regulations Observance Specific Absorption Rate SARRegulatory Information CE Approval European UnionFCC Statement Appendix a Circuit of Typical Interfaces Page Appendix B Acronyms and Abbreviations Acronym or Abbreviation ExpansionUIM PDURTC TTL