NEC 120 manual NAP Sheet 41/42 Termination of Cables on MDF

Page 118

NAP- 200-007

Sheet 41/42

Termination of Cables on MDF

LEN0000

LEN0001

LEN0004

LEN0005

LTC0 (J)

26

C.O.T0

1

C.O.R0

27

C.O.T1

2

C.O.R1

28

 

3

 

29

 

4

 

30

Sta.T0

5

Sta.R0

31

Sta.T1

6

Sta.R1

32

 

7

 

33

 

8

 

 

(P)

 

 

1

C.O.R0

26

C.O.T0

2

C.O.R1

27

C.O.T1

3

 

28

 

4

 

29

 

5

Sta.R0

30

Sta.T0

6

Sta.R1

31

Sta.T1

7

 

32

 

8

 

33

 

Figure 007-25 MDF Cross Connection for the PFT (Continued)

Note: The third and fourth circuits in the PN-4COT card cannot be used for the PFT function.

CHAPTER 3

AD-25182501

Page 104

Revision 1.0.1

Image 118
Contents Model 120 Installation Procedure Manual Liability Disclaimer NEAX7400 ICS Model Installation Procedure Manual 100 101 102 107 108 109 110 111 Issue Important Safety Considerations Page NEAX7400 ICS Table of Contents NEAX7400 ICSTable of Contents List of Illustrations Title 003-24 AD-25182501LIST of Illustrations List of Tables Purpose During installation, refer also to the manuals belowReference Manuals Scope of Installation Works HOW to Follow the ManualThis manual covers the installation shown in Figure Trunking Diagram Typical trunking diagram for the Pabx is shown in FigureDescription of Symbols in Trunking Diagram Symbol DescriptionSystem Configurations 1-PIM Configuration for Floor Standing Installation2-PIM Configuration for Floor Standing Installation 8-PIM Configuration for Floor Standing Installation 1-PIM Configuration for Wall-Mounting Installation PIM3 PIM2 PIM1 PIM0 Power, Ground Cabling and LIU for Australia PrecautionsGrounding Requirements Static Electricity Guard Static Electricity Guard Connecting Consoles’ Cables Procedure for Unplugging/Plugging Circuit CardsCircuitry Procedure Procedure FlowchartContents Static Sensitive Handling Precautions Required Unpacking Procedure NAP Sheet 1/1 UnpackingConfirmation of the Equipment Layout NAP Sheet 1/2 Marking and DrillingMarking and Drilling Floor Standing Wall-Mounting NAP Sheet 2/2 Marking and DrillingLocate and mark the wall mounting points as shown in Figure Installation of Modules NAP Sheet 1/29 Installation of Main EquipmentInstallation of the Battm and Mdfm Floor Standing Installation NAP Sheet 2/29 Installation of Main EquipmentConnect the Rack Parts to the rear of the Base NAP Sheet 3/29 Installation of Main Equipment Connection of Rack PartsNAP Sheet 4/29 Installation of Main Equipment Connection of the PIM and the Rack PartsNAP Sheet 5/29 Installation of Main Equipment Connection of PIMsNAP Sheet 6/29 Installation of Main Equipment Wall-Mounting InstallationRecommended Fasteners NAP Sheet 7/29 Installation of Main EquipmentWall Type Recommended Fastener NAP Sheet 8/29 Installation of Main Equipment Mounting Pabx to Rack PartsNAP Sheet 9/29 Installation of Main Equipment Screwing the Rack Parts to a WallNAP Sheet 10/29 Installation of Main Equipment 10 Screwing the Rack Parts and the BaseNAP Sheet 11/29 Installation of Main Equipment 11 Modular Layout for 1 PIM ConfigurationNAP Sheet 12/29 Installation of Main Equipment 13 Modular Layout for 3 PIM ConfigurationNAP Sheet 13/29 Installation of Main Equipment 14 Modular Layout for 4 PIM ConfigurationInstallation of Main Equipment Sheet 14/29 NAP ConfigurationPIM Configuration Installation of Main Equipment Sheet 15/29 NAPInstallation of Main Equipment Sheet 16/29 NAP 7PIMInstallation of Main Equipment Sheet 17/29 NAP Layout forPrecautions NAP Sheet 18/29 Installation of Main Equipment19-Inch Rack-Mounting Installation Stock NumberNAP Sheet 19/29 Installation of Main Equipment 19 1 PIM Configuration 19Rack MountNAP Sheet 20/29 Installation of Main Equipment 20 2 PIM Configuration 19Rack MountNAP Sheet 21/29 Installation of Main Equipment 21 3 PIM Configuration 19Rack MountNAP Sheet 22/29 Installation of Main Equipment 22 4 PIM Configuration 19Rack MountNAP Sheet 23/29 Installation of Main Equipment 23 Cable Connections and Switch Settings on PZ-PW86NAP Sheet 24/29 Installation of Main Equipment 24 Cable Connections and Switch Settings on PZ-PW86ANAP Sheet 25/29 Installation of Main Equipment 25 Cable Connection between the PZ-PW86 and the BWBNAP Sheet 26/29 Installation of Main Equipment 26 AC CORD-A Wiring to BaseNAP Sheet 27/29 Installation of Main Equipment 27 Mounting of the BUS CardsNAP Sheet 28/29 Installation of Main Equipment 28 BUS CableNAP Sheet 29/29 Installation of Main Equipment 29 Connection of the BUS CablesNAP Sheet 1/9 Installation of Peripheral Equipment Installation of SN694 AttconNAP Sheet 2/9 Installation of Peripheral Equipment ATT Cable Connection to SN694 AttconConnect the ATT cable to Main Equipment as shown in Figure NAP Sheet 3/9 Installation of Peripheral EquipmentATI CA-A NAP Sheet 4/9 Installation of Peripheral Equipment Installation CableNAP Sheet 5/9 Installation of Peripheral Equipment Installation of SN611 AttconNAP Sheet 6/9 Installation of Peripheral Equipment Jack Set Installation for SN611 AttconNAP Sheet 7/9 Installation of Peripheral Equipment Access to Switch on SN611 AttconNAP Sheet 8/9 Installation of Peripheral Equipment Switch Setting on SN611 AttconNAP Sheet 9/9 Installation of Peripheral Equipment Cable Connection to SN611 AttconNAP Sheet 1/4 Connection of Battery Internal Battery ConnectionNAP Sheet 2/4 Connection of Battery PWR CA-ANAP Sheet 3/4 Connection of Battery Internal Battery Connection for 8 PIMs ConfigurationNAP Sheet 4/4 Connection of Battery External Battery ConnectionNAP Sheet 1/3 Cable Running to MDF Cable Running to MDFMDF Cables for PIM NAP Sheet 2/3 Cable Running to MDFFrom Cable Number Designation Module Connection NAP Sheet 3/3 Cable Running to MDF Example of Existing MDF Cable RunningNAP Sheet 1/42 Termination of Cables on MDF LTC Connector Card Slot Number RemarksCable Connection to MDF NAP Sheet 2/42 Termination of Cables on MDF Location of LENNAP Sheet 3/42 Termination of Cables on MDF LEN 0256 ~Shows the LTC Connector Pin Arrangement PIM0 LTC0 ~ LTC2 NAP Sheet 4/42 Termination of Cables on MDFNAP Sheet 5/42 Termination of Cables on MDF PIM1 LTC0 ~ LTC2NAP Sheet 6/42 Termination of Cables on MDF PIM2 LTC0 ~ LTC2NAP Sheet 7/42 Termination of Cables on MDF PIM3 LTC0 ~ LTC2NAP Sheet 8/42 Termination of Cables on MDF PIM4 LTC0 ~ LTC2NAP Sheet 9/42 Termination of Cables on MDF PIM5 LTC0 ~ LTC2NAP Sheet 10/42 Termination of Cables on MDF PIM6 LTC0 ~ LTC2NAP Sheet 11/42 Termination of Cables on MDF PIM7 LTC0 ~ LTC2MDF Cross Connections NAP Sheet 12/42 Termination of Cables on MDFTxT0 TxR0 RxT0 RxR0 TxT1 TxR1 RxT1 RxR1 NAP Sheet 13/42 Termination of Cables on MDF TxT0 TxR0 RxT0 RxR0 TxT1 TxR1 RxT1 RxR1 50 MN 25 MJNAP Sheet 14/42 Termination of Cables on MDF NAP Sheet 15/42 Termination of Cables on MDF 50 MN 25 MJNAP Sheet 16/42 Termination of Cables on MDF O./D.I.D. Trunks Line C.O. Trunks PN-4COTE and PN-4DITBNAP Sheet 17/42 Termination of Cables on MDF Line C.O. Trunk PN-2COTDNAP Sheet 18/42 Termination of Cables on MDF Tie Line Trunk 4W E&M Trunk PN-2ODTANAP Sheet 19/42 Termination of Cables on MDF NAP Sheet 20/42 Termination of Cables on MDF LD Trunk PN-2LDTANAP Sheet 21/42 Termination of Cables on MDF Line did Trunk PN-AUCANAP Sheet 22/42 Termination of Cables on MDF Single Line Telephone SLT Standard Line PN-4LCE/4LCFNAP Sheet 23/42 Termination of Cables on MDF Long Line PN-AUCANAP Sheet 24/42 Termination of Cables on MDF Dterm /DSS Console Standard Line PN-4DLCANAP Sheet 25/42 Termination of Cables on MDF Long Line PN-2DLCBNAP Sheet 26/42 Termination of Cables on MDF SN611 Attcon and Dterm 6D/16D series telephonesDay/Night Mode Change by External Key NAP Sheet 27/42 Termination of Cables on MDFExternal TAS Indicator Outline of the Connections NAP Sheet 28/42 Termination of Cables on MDF16 MDF Cross Connection for a TAS Indicator with a Battery NAP Sheet 29/42 Termination of Cables on MDFNAP Sheet 30/42 Termination of Cables on MDF NAP Sheet 31/42 Termination of Cables on MDF 18 Outline of the Paging Equipment ConnectionNAP Sheet 32/42 Termination of Cables on MDF MDF Cross ConnectionNAP Sheet 33/42 Termination of Cables on MDF NAP Sheet 34/42 Termination of Cables on MDF 20 Outline of the External Music ConnectionNAP Sheet 35/42 Termination of Cables on MDF 21 MDF Cross Connection for External Music EquipmentNAP Sheet 36/42 Termination of Cables on MDF 22 Connecting Method of Music Source with D.C. Offset NAP Sheet 37/42 Termination of Cables on MDFNAP Sheet 38/42 Termination of Cables on MDF 23 MDF Cross Connection for External BGM SourcesNAP Sheet 39/42 Termination of Cables on MDF 24 Outline of the PFT ConnectionNAP Sheet 40/42 Termination of Cables on MDF 25 MDF Cross Connection for the PFTNAP Sheet 41/42 Termination of Cables on MDF 26 MDF Cross Connection for Alarm Display Panel NAP Sheet 42/42 Termination of Cables on MDFMounting Procedure NAP Sheet 1/2 Mounting of Circuit CardsNAP Sheet 2/2 Mounting of Circuit Cards All Clear, Except LEN0000 CAT NAP Sheet 1/3 System Initialization and System Data EntrySystem Initialization Resident System ProgramNAP Sheet 2/3 System Initialization and System Data Entry CAT Customer Administration TerminalSystem Data Entry MAT Maintainance Administration Terminal NAP Sheet 3/3 System Initialization and System Data EntryNAP Sheet 1/1 Operation Test Operation Test
Related manuals
Manual 46 pages 11.86 Kb Manual 78 pages 59.26 Kb

120 specifications

The NEC 120 is a well-regarded platform that exemplifies cutting-edge technology and performance in its category. Designed primarily for high-performance computing and telecommunications applications, the NEC 120 has become a staple in many industries, providing robust solutions for demanding workloads.

One of the standout features of the NEC 120 is its microwave technology, which utilizes advanced signal processing capabilities. This system enhances the efficiency of data transmission, reducing latency and boosting overall communication performance. The NEC 120's ability to handle high-frequency signals makes it especially valuable in environments that require rapid data processing, such as mobile networks and internet service providers.

In terms of hardware, the NEC 120 is powered by a multi-core processor architecture, enabling parallel processing that significantly improves computational speed. This feature is essential for applications that handle complex calculations and large volumes of data simultaneously. Additionally, the architecture is complemented by a high-capacity memory system that supports extensive data storage and retrieval, catering to the needs of enterprise-level applications.

Another notable characteristic of the NEC 120 is its modular design. This allows for customization and scalability, making it easy for organizations to adapt the system to their specific requirements. Whether a company needs to expand its capabilities or integrate new technologies, the NEC 120 can be updated without complete system overhauls, thus maintaining cost-effectiveness.

The NEC 120 also excels in its energy efficiency, which is critical in today’s environmentally conscious technology landscape. By minimizing power consumption while maximizing performance, the platform not only reduces operational costs but also aligns with sustainable practices.

Security is an increasingly important aspect of technology, and the NEC 120 addresses this with robust security features to protect data integrity and privacy. This includes advanced encryption methods and secure access protocols, ensuring that sensitive information is safeguarded from breaches.

Overall, the NEC 120 stands as a testament to NEC Corporation's commitment to delivering innovative and reliable technology solutions. With its emphasis on performance, scalability, and security, the NEC 120 is well-suited for a wide range of applications, from telecommunications to enterprise computing, making it a valuable asset for organizations aiming for technological advancement.