NEC 120 manual NAP Sheet 23/29 Installation of Main Equipment

Page 55

NAP- 200-003

Sheet 23/29

Installation of Main Equipment

2.1Cable Connections and Switch Settings on PZ-PW86 Note: This version is now obsolete.

WARNINGS, RE MODE SWITCH:

1.SEGMENT 1: Set to ON.

2.SEGMENT 2: Set to ON (left) only, which is 27 volts (FLOAT). The OFF setting is 28 volts (EQUALIZE), to be used only for periodic boost-charging of EXTERNAL VENTED batteries.

3.This unit is best suited to sealed batteries; the preferred item for vented batteries is PZ-PW86(A).

 

 

 

 

 

 

 

MJ

Note 2: In Australia, GND and FG are bonded

 

 

 

 

 

 

 

 

 

 

elsewhere, so are not to be linked here.

 

 

 

 

 

 

 

MN

 

 

 

 

 

 

 

 

 

 

ON

 

 

 

The TRC Earth connects to the “GND”

Note 1: Set to ON for

 

 

 

 

 

 

 

 

 

terminal on every PIM.

normal operation.

 

ON

 

 

 

 

 

 

 

1

 

 

MODE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POWER OUTPUT

 

 

 

 

 

 

 

 

 

GND See

 

CABLE (+5V, -27V, E)

 

 

 

 

 

 

 

 

 

TO AUXILIARY

 

 

 

 

 

 

 

 

 

 

 

 

FG Note 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RINGER OUTPUT

 

EQUIPMENT

 

 

 

 

 

-27V

 

 

 

 

 

 

 

 

 

CABLE (CR,E)

 

MAX: 2.5A DC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TO PWR1

TO PWR0A CONNECTOR

TO PWR0B CONNECTOR

CONNECTOR

 

PWR CNT CA-A

TO OTHER

BATT2

PZ-PW86

SW

 

 

 

 

 

 

 

 

 

 

I

 

 

 

 

 

 

 

 

 

 

 

 

AC/BATTERY SWITCH

 

 

 

PWR CA-A

 

 

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*

 

 

 

 

 

OFF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

O

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TO BATTERY OR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OTHER PZ-PW86

 

 

 

 

 

 

 

 

100/

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BATT1 120V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AC

 

 

 

 

 

 

 

CAUTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BATTERY CABLE/PWR CA-A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Set the appropriate voltage before turning on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the AC switch.

 

 

 

 

 

BLUE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

240V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BROWN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AC INPUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TO

 

 

 

 

TERMINAL ON THE CHASSIS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GREEN/YELLOW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AC CORD-A

TO AC MAINS INPUT

*Cabling method is determined by usage of internal or external battery. See NAP-200-005.

Figure 003-23 Cable Connections and Switch Settings on PZ-PW86

AD-25182501

CHAPTER 3

Page 41

Revision 1.0.1

Image 55
Contents Model 120 Installation Procedure Manual Liability Disclaimer NEAX7400 ICS Model Installation Procedure Manual 100 101 102 107 108 109 110 111 Issue Important Safety Considerations Page NEAX7400 ICS NEAX7400 ICS Table of ContentsTable of Contents List of Illustrations Title 003-24 AD-25182501LIST of Illustrations List of Tables Purpose During installation, refer also to the manuals belowReference Manuals Scope of Installation Works HOW to Follow the ManualThis manual covers the installation shown in Figure Typical trunking diagram for the Pabx is shown in Figure Trunking DiagramSymbol Description Description of Symbols in Trunking Diagram1-PIM Configuration for Floor Standing Installation System Configurations2-PIM Configuration for Floor Standing Installation 8-PIM Configuration for Floor Standing Installation 1-PIM Configuration for Wall-Mounting Installation PIM3 PIM2 PIM1 PIM0 Power, Ground Cabling and LIU for Australia PrecautionsGrounding Requirements Static Electricity Guard Static Electricity Guard Connecting Consoles’ Cables Procedure for Unplugging/Plugging Circuit CardsCircuitry Procedure Flowchart ProcedureContents Static Sensitive Handling Precautions Required NAP Sheet 1/1 Unpacking Unpacking ProcedureConfirmation of the Equipment Layout NAP Sheet 1/2 Marking and DrillingMarking and Drilling Floor Standing Wall-Mounting NAP Sheet 2/2 Marking and DrillingLocate and mark the wall mounting points as shown in Figure Installation of Modules NAP Sheet 1/29 Installation of Main EquipmentInstallation of the Battm and Mdfm Floor Standing Installation NAP Sheet 2/29 Installation of Main EquipmentConnect the Rack Parts to the rear of the Base Connection of Rack Parts NAP Sheet 3/29 Installation of Main EquipmentConnection of the PIM and the Rack Parts NAP Sheet 4/29 Installation of Main EquipmentConnection of PIMs NAP Sheet 5/29 Installation of Main EquipmentWall-Mounting Installation NAP Sheet 6/29 Installation of Main EquipmentRecommended Fasteners NAP Sheet 7/29 Installation of Main EquipmentWall Type Recommended Fastener Mounting Pabx to Rack Parts NAP Sheet 8/29 Installation of Main EquipmentScrewing the Rack Parts to a Wall NAP Sheet 9/29 Installation of Main Equipment10 Screwing the Rack Parts and the Base NAP Sheet 10/29 Installation of Main Equipment11 Modular Layout for 1 PIM Configuration NAP Sheet 11/29 Installation of Main Equipment13 Modular Layout for 3 PIM Configuration NAP Sheet 12/29 Installation of Main Equipment14 Modular Layout for 4 PIM Configuration NAP Sheet 13/29 Installation of Main EquipmentConfiguration Installation of Main Equipment Sheet 14/29 NAPInstallation of Main Equipment Sheet 15/29 NAP PIM Configuration7PIM Installation of Main Equipment Sheet 16/29 NAPLayout for Installation of Main Equipment Sheet 17/29 NAPStock Number NAP Sheet 18/29 Installation of Main Equipment19-Inch Rack-Mounting Installation Precautions19 1 PIM Configuration 19Rack Mount NAP Sheet 19/29 Installation of Main Equipment20 2 PIM Configuration 19Rack Mount NAP Sheet 20/29 Installation of Main Equipment21 3 PIM Configuration 19Rack Mount NAP Sheet 21/29 Installation of Main Equipment22 4 PIM Configuration 19Rack Mount NAP Sheet 22/29 Installation of Main Equipment23 Cable Connections and Switch Settings on PZ-PW86 NAP Sheet 23/29 Installation of Main Equipment24 Cable Connections and Switch Settings on PZ-PW86A NAP Sheet 24/29 Installation of Main Equipment25 Cable Connection between the PZ-PW86 and the BWB NAP Sheet 25/29 Installation of Main Equipment26 AC CORD-A Wiring to Base NAP Sheet 26/29 Installation of Main Equipment27 Mounting of the BUS Cards NAP Sheet 27/29 Installation of Main Equipment28 BUS Cable NAP Sheet 28/29 Installation of Main Equipment29 Connection of the BUS Cables NAP Sheet 29/29 Installation of Main EquipmentInstallation of SN694 Attcon NAP Sheet 1/9 Installation of Peripheral EquipmentATT Cable Connection to SN694 Attcon NAP Sheet 2/9 Installation of Peripheral EquipmentConnect the ATT cable to Main Equipment as shown in Figure NAP Sheet 3/9 Installation of Peripheral EquipmentATI CA-A Installation Cable NAP Sheet 4/9 Installation of Peripheral EquipmentInstallation of SN611 Attcon NAP Sheet 5/9 Installation of Peripheral EquipmentJack Set Installation for SN611 Attcon NAP Sheet 6/9 Installation of Peripheral EquipmentAccess to Switch on SN611 Attcon NAP Sheet 7/9 Installation of Peripheral EquipmentSwitch Setting on SN611 Attcon NAP Sheet 8/9 Installation of Peripheral EquipmentCable Connection to SN611 Attcon NAP Sheet 9/9 Installation of Peripheral EquipmentInternal Battery Connection NAP Sheet 1/4 Connection of BatteryPWR CA-A NAP Sheet 2/4 Connection of BatteryInternal Battery Connection for 8 PIMs Configuration NAP Sheet 3/4 Connection of BatteryExternal Battery Connection NAP Sheet 4/4 Connection of BatteryCable Running to MDF NAP Sheet 1/3 Cable Running to MDFMDF Cables for PIM NAP Sheet 2/3 Cable Running to MDFFrom Cable Number Designation Module Connection Example of Existing MDF Cable Running NAP Sheet 3/3 Cable Running to MDFNAP Sheet 1/42 Termination of Cables on MDF LTC Connector Card Slot Number RemarksCable Connection to MDF Location of LEN NAP Sheet 2/42 Termination of Cables on MDFLEN 0256 ~ NAP Sheet 3/42 Termination of Cables on MDFNAP Sheet 4/42 Termination of Cables on MDF Shows the LTC Connector Pin Arrangement PIM0 LTC0 ~ LTC2PIM1 LTC0 ~ LTC2 NAP Sheet 5/42 Termination of Cables on MDFPIM2 LTC0 ~ LTC2 NAP Sheet 6/42 Termination of Cables on MDFPIM3 LTC0 ~ LTC2 NAP Sheet 7/42 Termination of Cables on MDFPIM4 LTC0 ~ LTC2 NAP Sheet 8/42 Termination of Cables on MDFPIM5 LTC0 ~ LTC2 NAP Sheet 9/42 Termination of Cables on MDFPIM6 LTC0 ~ LTC2 NAP Sheet 10/42 Termination of Cables on MDFPIM7 LTC0 ~ LTC2 NAP Sheet 11/42 Termination of Cables on MDFMDF Cross Connections NAP Sheet 12/42 Termination of Cables on MDFTxT0 TxR0 RxT0 RxR0 TxT1 TxR1 RxT1 RxR1 TxT0 TxR0 RxT0 RxR0 TxT1 TxR1 RxT1 RxR1 50 MN 25 MJ NAP Sheet 13/42 Termination of Cables on MDFNAP Sheet 14/42 Termination of Cables on MDF 50 MN 25 MJ NAP Sheet 15/42 Termination of Cables on MDFO./D.I.D. Trunks Line C.O. Trunks PN-4COTE and PN-4DITB NAP Sheet 16/42 Termination of Cables on MDFLine C.O. Trunk PN-2COTD NAP Sheet 17/42 Termination of Cables on MDFTie Line Trunk 4W E&M Trunk PN-2ODTA NAP Sheet 18/42 Termination of Cables on MDFNAP Sheet 19/42 Termination of Cables on MDF LD Trunk PN-2LDTA NAP Sheet 20/42 Termination of Cables on MDFLine did Trunk PN-AUCA NAP Sheet 21/42 Termination of Cables on MDFSingle Line Telephone SLT Standard Line PN-4LCE/4LCF NAP Sheet 22/42 Termination of Cables on MDFLong Line PN-AUCA NAP Sheet 23/42 Termination of Cables on MDFDterm /DSS Console Standard Line PN-4DLCA NAP Sheet 24/42 Termination of Cables on MDFLong Line PN-2DLCB NAP Sheet 25/42 Termination of Cables on MDFSN611 Attcon and Dterm 6D/16D series telephones NAP Sheet 26/42 Termination of Cables on MDFNAP Sheet 27/42 Termination of Cables on MDF Day/Night Mode Change by External KeyNAP Sheet 28/42 Termination of Cables on MDF External TAS Indicator Outline of the ConnectionsNAP Sheet 29/42 Termination of Cables on MDF 16 MDF Cross Connection for a TAS Indicator with a BatteryNAP Sheet 30/42 Termination of Cables on MDF 18 Outline of the Paging Equipment Connection NAP Sheet 31/42 Termination of Cables on MDFMDF Cross Connection NAP Sheet 32/42 Termination of Cables on MDFNAP Sheet 33/42 Termination of Cables on MDF 20 Outline of the External Music Connection NAP Sheet 34/42 Termination of Cables on MDF21 MDF Cross Connection for External Music Equipment NAP Sheet 35/42 Termination of Cables on MDFNAP Sheet 36/42 Termination of Cables on MDF NAP Sheet 37/42 Termination of Cables on MDF 22 Connecting Method of Music Source with D.C. Offset23 MDF Cross Connection for External BGM Sources NAP Sheet 38/42 Termination of Cables on MDF24 Outline of the PFT Connection NAP Sheet 39/42 Termination of Cables on MDF25 MDF Cross Connection for the PFT NAP Sheet 40/42 Termination of Cables on MDFNAP Sheet 41/42 Termination of Cables on MDF NAP Sheet 42/42 Termination of Cables on MDF 26 MDF Cross Connection for Alarm Display PanelNAP Sheet 1/2 Mounting of Circuit Cards Mounting ProcedureNAP Sheet 2/2 Mounting of Circuit Cards Resident System Program NAP Sheet 1/3 System Initialization and System Data EntrySystem Initialization All Clear, Except LEN0000 CATNAP Sheet 2/3 System Initialization and System Data Entry CAT Customer Administration TerminalSystem Data Entry NAP Sheet 3/3 System Initialization and System Data Entry MAT Maintainance Administration TerminalOperation Test NAP Sheet 1/1 Operation Test
Related manuals
Manual 46 pages 11.86 Kb Manual 78 pages 59.26 Kb

120 specifications

The NEC 120 is a well-regarded platform that exemplifies cutting-edge technology and performance in its category. Designed primarily for high-performance computing and telecommunications applications, the NEC 120 has become a staple in many industries, providing robust solutions for demanding workloads.

One of the standout features of the NEC 120 is its microwave technology, which utilizes advanced signal processing capabilities. This system enhances the efficiency of data transmission, reducing latency and boosting overall communication performance. The NEC 120's ability to handle high-frequency signals makes it especially valuable in environments that require rapid data processing, such as mobile networks and internet service providers.

In terms of hardware, the NEC 120 is powered by a multi-core processor architecture, enabling parallel processing that significantly improves computational speed. This feature is essential for applications that handle complex calculations and large volumes of data simultaneously. Additionally, the architecture is complemented by a high-capacity memory system that supports extensive data storage and retrieval, catering to the needs of enterprise-level applications.

Another notable characteristic of the NEC 120 is its modular design. This allows for customization and scalability, making it easy for organizations to adapt the system to their specific requirements. Whether a company needs to expand its capabilities or integrate new technologies, the NEC 120 can be updated without complete system overhauls, thus maintaining cost-effectiveness.

The NEC 120 also excels in its energy efficiency, which is critical in today’s environmentally conscious technology landscape. By minimizing power consumption while maximizing performance, the platform not only reduces operational costs but also aligns with sustainable practices.

Security is an increasingly important aspect of technology, and the NEC 120 addresses this with robust security features to protect data integrity and privacy. This includes advanced encryption methods and secure access protocols, ensuring that sensitive information is safeguarded from breaches.

Overall, the NEC 120 stands as a testament to NEC Corporation's commitment to delivering innovative and reliable technology solutions. With its emphasis on performance, scalability, and security, the NEC 120 is well-suited for a wide range of applications, from telecommunications to enterprise computing, making it a valuable asset for organizations aiming for technological advancement.