NEC 120 manual NAP Sheet 4/42 Termination of Cables on MDF

Page 81

NAP- 200-007

Sheet 4/42

Termination of Cables on MDF

(3)Figure 007-3 shows the LTC Connector Pin Arrangement.

(a)PIM0 (LTC0 ~ LTC2)

 

LTC0

 

 

 

 

LTC1

 

 

 

26

 

1

 

LEN0000

 

26

 

1

 

 

 

27

 

2

 

0001

LT00

27

 

2

 

LEN0024

 

28

 

3

 

0002

28

 

3

 

0025

LT06

 

 

 

 

 

29

 

4

 

0003

 

29

 

4

 

0026

 

 

 

 

 

 

30

 

5

 

0004

 

30

 

5

 

0027

 

 

 

 

 

31

 

6

 

0005

LT01

31

 

6

 

0028

 

32

 

7

 

0006

32

 

7

 

0029

LT07

 

 

 

 

 

33

 

8

 

0007

 

33

 

8

 

0030

 

34

 

9

 

0008

 

34

 

9

 

0031

 

 

 

 

 

35

 

10

 

0009

LT02

35

 

10

 

0032

 

 

 

 

 

 

36

 

11

 

36

 

11

 

 

 

 

 

0010

 

 

 

0033

LT08

37

 

12

 

0011

 

37

 

12

 

0034

 

 

 

 

 

 

38

 

13

 

0012

 

38

 

13

 

0035

 

39

 

14

 

0013

LT03

39

 

14

 

0036

 

40

 

15

 

0014

40

 

15

 

0037

LT09

 

 

 

 

 

41

 

16

 

0015

 

41

 

16

 

0038

 

 

 

 

 

 

42

 

17

 

0016

 

42

 

17

 

0039

 

43

 

18

 

0017

LT04

43

 

18

 

0040

 

44

 

19

 

0018

44

 

19

 

0041

LT10/AP0

45

 

20

 

0019

 

45

 

20

 

0042

 

46

 

21

 

0020

 

46

 

21

 

0043

 

47

 

22

 

0021

LT05

47

 

22

 

0044

 

48

 

23

 

0022

48

 

23

 

0045

LT11/AP1

49

 

24

 

LEN0023

 

49

 

24

 

0046

 

 

 

50

MN

25

MJ

 

 

50

 

25

 

LEN0047

 

 

 

 

 

 

LTC2

261

272

283

294

305

316

327

338

349

3510

3611

3712

3813

3914

4015

4116

4217

4318

4419

4520

4621

4722

4823

4924

5025

LEN0048 0049 0050 0051 0052 0053 0054 0055 0056 0057 0058 0059 0060 0061 0062

LEN0063

LT12/AP2

LT13/AP3

LT14/AP4

LT15/AP5

AP6 Note: These pins are used only for the PN-BRTA and PN-30DTC.

Figure 007-3: LTC Connector Pin Arrangement

AD-25182501CHAPTER 3

Page 67

Revision 1.0.1

Image 81
Contents Model 120 Installation Procedure Manual Liability Disclaimer NEAX7400 ICS Model Installation Procedure Manual 100 101 102 107 108 109 110 111 Issue Important Safety Considerations Page NEAX7400 ICS NEAX7400 ICS Table of ContentsTable of Contents List of Illustrations Title 003-24 AD-25182501LIST of Illustrations List of Tables During installation, refer also to the manuals below PurposeReference Manuals HOW to Follow the Manual Scope of Installation WorksThis manual covers the installation shown in Figure Typical trunking diagram for the Pabx is shown in Figure Trunking DiagramSymbol Description Description of Symbols in Trunking Diagram1-PIM Configuration for Floor Standing Installation System Configurations2-PIM Configuration for Floor Standing Installation 8-PIM Configuration for Floor Standing Installation 1-PIM Configuration for Wall-Mounting Installation PIM3 PIM2 PIM1 PIM0 Precautions Power, Ground Cabling and LIU for AustraliaGrounding Requirements Static Electricity Guard Static Electricity Guard Procedure for Unplugging/Plugging Circuit Cards Connecting Consoles’ CablesCircuitry Procedure Flowchart ProcedureContents Static Sensitive Handling Precautions Required NAP Sheet 1/1 Unpacking Unpacking ProcedureNAP Sheet 1/2 Marking and Drilling Confirmation of the Equipment LayoutMarking and Drilling Floor Standing NAP Sheet 2/2 Marking and Drilling Wall-MountingLocate and mark the wall mounting points as shown in Figure NAP Sheet 1/29 Installation of Main Equipment Installation of ModulesInstallation of the Battm and Mdfm NAP Sheet 2/29 Installation of Main Equipment Floor Standing InstallationConnect the Rack Parts to the rear of the Base Connection of Rack Parts NAP Sheet 3/29 Installation of Main EquipmentConnection of the PIM and the Rack Parts NAP Sheet 4/29 Installation of Main EquipmentConnection of PIMs NAP Sheet 5/29 Installation of Main EquipmentWall-Mounting Installation NAP Sheet 6/29 Installation of Main EquipmentNAP Sheet 7/29 Installation of Main Equipment Recommended FastenersWall Type Recommended Fastener Mounting Pabx to Rack Parts NAP Sheet 8/29 Installation of Main EquipmentScrewing the Rack Parts to a Wall NAP Sheet 9/29 Installation of Main Equipment10 Screwing the Rack Parts and the Base NAP Sheet 10/29 Installation of Main Equipment11 Modular Layout for 1 PIM Configuration NAP Sheet 11/29 Installation of Main Equipment13 Modular Layout for 3 PIM Configuration NAP Sheet 12/29 Installation of Main Equipment14 Modular Layout for 4 PIM Configuration NAP Sheet 13/29 Installation of Main EquipmentConfiguration Installation of Main Equipment Sheet 14/29 NAPInstallation of Main Equipment Sheet 15/29 NAP PIM Configuration7PIM Installation of Main Equipment Sheet 16/29 NAPLayout for Installation of Main Equipment Sheet 17/29 NAP19-Inch Rack-Mounting Installation NAP Sheet 18/29 Installation of Main EquipmentPrecautions Stock Number19 1 PIM Configuration 19Rack Mount NAP Sheet 19/29 Installation of Main Equipment20 2 PIM Configuration 19Rack Mount NAP Sheet 20/29 Installation of Main Equipment21 3 PIM Configuration 19Rack Mount NAP Sheet 21/29 Installation of Main Equipment22 4 PIM Configuration 19Rack Mount NAP Sheet 22/29 Installation of Main Equipment23 Cable Connections and Switch Settings on PZ-PW86 NAP Sheet 23/29 Installation of Main Equipment24 Cable Connections and Switch Settings on PZ-PW86A NAP Sheet 24/29 Installation of Main Equipment25 Cable Connection between the PZ-PW86 and the BWB NAP Sheet 25/29 Installation of Main Equipment26 AC CORD-A Wiring to Base NAP Sheet 26/29 Installation of Main Equipment27 Mounting of the BUS Cards NAP Sheet 27/29 Installation of Main Equipment28 BUS Cable NAP Sheet 28/29 Installation of Main Equipment29 Connection of the BUS Cables NAP Sheet 29/29 Installation of Main EquipmentInstallation of SN694 Attcon NAP Sheet 1/9 Installation of Peripheral EquipmentATT Cable Connection to SN694 Attcon NAP Sheet 2/9 Installation of Peripheral EquipmentNAP Sheet 3/9 Installation of Peripheral Equipment Connect the ATT cable to Main Equipment as shown in FigureATI CA-A Installation Cable NAP Sheet 4/9 Installation of Peripheral EquipmentInstallation of SN611 Attcon NAP Sheet 5/9 Installation of Peripheral EquipmentJack Set Installation for SN611 Attcon NAP Sheet 6/9 Installation of Peripheral EquipmentAccess to Switch on SN611 Attcon NAP Sheet 7/9 Installation of Peripheral EquipmentSwitch Setting on SN611 Attcon NAP Sheet 8/9 Installation of Peripheral EquipmentCable Connection to SN611 Attcon NAP Sheet 9/9 Installation of Peripheral EquipmentInternal Battery Connection NAP Sheet 1/4 Connection of BatteryPWR CA-A NAP Sheet 2/4 Connection of BatteryInternal Battery Connection for 8 PIMs Configuration NAP Sheet 3/4 Connection of BatteryExternal Battery Connection NAP Sheet 4/4 Connection of BatteryCable Running to MDF NAP Sheet 1/3 Cable Running to MDFNAP Sheet 2/3 Cable Running to MDF MDF Cables for PIMFrom Cable Number Designation Module Connection Example of Existing MDF Cable Running NAP Sheet 3/3 Cable Running to MDFLTC Connector Card Slot Number Remarks NAP Sheet 1/42 Termination of Cables on MDFCable Connection to MDF Location of LEN NAP Sheet 2/42 Termination of Cables on MDFLEN 0256 ~ NAP Sheet 3/42 Termination of Cables on MDFNAP Sheet 4/42 Termination of Cables on MDF Shows the LTC Connector Pin Arrangement PIM0 LTC0 ~ LTC2PIM1 LTC0 ~ LTC2 NAP Sheet 5/42 Termination of Cables on MDFPIM2 LTC0 ~ LTC2 NAP Sheet 6/42 Termination of Cables on MDFPIM3 LTC0 ~ LTC2 NAP Sheet 7/42 Termination of Cables on MDFPIM4 LTC0 ~ LTC2 NAP Sheet 8/42 Termination of Cables on MDFPIM5 LTC0 ~ LTC2 NAP Sheet 9/42 Termination of Cables on MDFPIM6 LTC0 ~ LTC2 NAP Sheet 10/42 Termination of Cables on MDFPIM7 LTC0 ~ LTC2 NAP Sheet 11/42 Termination of Cables on MDFNAP Sheet 12/42 Termination of Cables on MDF MDF Cross ConnectionsTxT0 TxR0 RxT0 RxR0 TxT1 TxR1 RxT1 RxR1 TxT0 TxR0 RxT0 RxR0 TxT1 TxR1 RxT1 RxR1 50 MN 25 MJ NAP Sheet 13/42 Termination of Cables on MDFNAP Sheet 14/42 Termination of Cables on MDF 50 MN 25 MJ NAP Sheet 15/42 Termination of Cables on MDFO./D.I.D. Trunks Line C.O. Trunks PN-4COTE and PN-4DITB NAP Sheet 16/42 Termination of Cables on MDFLine C.O. Trunk PN-2COTD NAP Sheet 17/42 Termination of Cables on MDFTie Line Trunk 4W E&M Trunk PN-2ODTA NAP Sheet 18/42 Termination of Cables on MDFNAP Sheet 19/42 Termination of Cables on MDF LD Trunk PN-2LDTA NAP Sheet 20/42 Termination of Cables on MDFLine did Trunk PN-AUCA NAP Sheet 21/42 Termination of Cables on MDFSingle Line Telephone SLT Standard Line PN-4LCE/4LCF NAP Sheet 22/42 Termination of Cables on MDFLong Line PN-AUCA NAP Sheet 23/42 Termination of Cables on MDFDterm /DSS Console Standard Line PN-4DLCA NAP Sheet 24/42 Termination of Cables on MDFLong Line PN-2DLCB NAP Sheet 25/42 Termination of Cables on MDFSN611 Attcon and Dterm 6D/16D series telephones NAP Sheet 26/42 Termination of Cables on MDFNAP Sheet 27/42 Termination of Cables on MDF Day/Night Mode Change by External KeyNAP Sheet 28/42 Termination of Cables on MDF External TAS Indicator Outline of the ConnectionsNAP Sheet 29/42 Termination of Cables on MDF 16 MDF Cross Connection for a TAS Indicator with a BatteryNAP Sheet 30/42 Termination of Cables on MDF 18 Outline of the Paging Equipment Connection NAP Sheet 31/42 Termination of Cables on MDFMDF Cross Connection NAP Sheet 32/42 Termination of Cables on MDFNAP Sheet 33/42 Termination of Cables on MDF 20 Outline of the External Music Connection NAP Sheet 34/42 Termination of Cables on MDF21 MDF Cross Connection for External Music Equipment NAP Sheet 35/42 Termination of Cables on MDFNAP Sheet 36/42 Termination of Cables on MDF NAP Sheet 37/42 Termination of Cables on MDF 22 Connecting Method of Music Source with D.C. Offset23 MDF Cross Connection for External BGM Sources NAP Sheet 38/42 Termination of Cables on MDF24 Outline of the PFT Connection NAP Sheet 39/42 Termination of Cables on MDF25 MDF Cross Connection for the PFT NAP Sheet 40/42 Termination of Cables on MDFNAP Sheet 41/42 Termination of Cables on MDF NAP Sheet 42/42 Termination of Cables on MDF 26 MDF Cross Connection for Alarm Display PanelNAP Sheet 1/2 Mounting of Circuit Cards Mounting ProcedureNAP Sheet 2/2 Mounting of Circuit Cards System Initialization NAP Sheet 1/3 System Initialization and System Data EntryAll Clear, Except LEN0000 CAT Resident System ProgramCAT Customer Administration Terminal NAP Sheet 2/3 System Initialization and System Data EntrySystem Data Entry NAP Sheet 3/3 System Initialization and System Data Entry MAT Maintainance Administration TerminalOperation Test NAP Sheet 1/1 Operation Test
Related manuals
Manual 46 pages 11.86 Kb Manual 78 pages 59.26 Kb

120 specifications

The NEC 120 is a well-regarded platform that exemplifies cutting-edge technology and performance in its category. Designed primarily for high-performance computing and telecommunications applications, the NEC 120 has become a staple in many industries, providing robust solutions for demanding workloads.

One of the standout features of the NEC 120 is its microwave technology, which utilizes advanced signal processing capabilities. This system enhances the efficiency of data transmission, reducing latency and boosting overall communication performance. The NEC 120's ability to handle high-frequency signals makes it especially valuable in environments that require rapid data processing, such as mobile networks and internet service providers.

In terms of hardware, the NEC 120 is powered by a multi-core processor architecture, enabling parallel processing that significantly improves computational speed. This feature is essential for applications that handle complex calculations and large volumes of data simultaneously. Additionally, the architecture is complemented by a high-capacity memory system that supports extensive data storage and retrieval, catering to the needs of enterprise-level applications.

Another notable characteristic of the NEC 120 is its modular design. This allows for customization and scalability, making it easy for organizations to adapt the system to their specific requirements. Whether a company needs to expand its capabilities or integrate new technologies, the NEC 120 can be updated without complete system overhauls, thus maintaining cost-effectiveness.

The NEC 120 also excels in its energy efficiency, which is critical in today’s environmentally conscious technology landscape. By minimizing power consumption while maximizing performance, the platform not only reduces operational costs but also aligns with sustainable practices.

Security is an increasingly important aspect of technology, and the NEC 120 addresses this with robust security features to protect data integrity and privacy. This includes advanced encryption methods and secure access protocols, ensuring that sensitive information is safeguarded from breaches.

Overall, the NEC 120 stands as a testament to NEC Corporation's commitment to delivering innovative and reliable technology solutions. With its emphasis on performance, scalability, and security, the NEC 120 is well-suited for a wide range of applications, from telecommunications to enterprise computing, making it a valuable asset for organizations aiming for technological advancement.