AT&T 2448 installation instructions Introduction

Page 5

Introduction

This manual will show you how to install the SPIRIT ® 2448 Expansion Unit with your SPIRIT Communications System. Please read the instructions carefully before beginning installation.

Instructions for installing wiring runs and telephones are part of the installation manual provided with the SPIRIT 1224 Controller.

Overview Of Unit

What You Should Find in the Boxes

expansion unit power supply unit brace

strap

six ½” screws

4-foot grounding wire

System Directory Label (attached to the back of the panel) label sheets

Installation Instructions

If your network interface jack (where the telephone company lines come into your building or office has two lines on a single jack you should purchase a 267C adapter and a line cord (D4BU) from your phone store or from your AT&T representative. If you need longer line and telephone cords, you should purchase them also.

Main

Power Supply

U n i t

CONTROLLER SECTION

AC Outlet

(standard 120 VAC)

Network Interface Jack

WIRING RUN SECTION

a jack field installed near your control unit location

cable extending from the jack field to each telephone location

TELEPHONE SET SECTION

Expansion

Power Supply U n i t

Grounding

Wire

AC Outlet

(standard 120 VAC)

jumper cords plugged into the jak field and into the control unit

Brace

Strap

a modular connecting block at the end of each cable (telephones will be plugged in later)

SPIRIT is a registered trademark of AT&T

Expansion Unit Installation 1

Image 5
Contents AT&T Page Important Safety Instructions Page Introduction Installation Attach Expansion Unit to Main Controller Mounting Holes and Distances Refer to Part D of Step