STEP 7
View from front of Stand
Front Rail | Front Rail |
|
Front Moulding
Front Moulding
Ensure that Front Rail, Front Moulding and Base are all flush on outside edge.
1.Fasten the Front Rails and Front Mouldings to the Base while holding them flush with outside edge of Stand using 2 Locking Screws.