Haier HSU-22HRA03/R2 On Drainage, Power Source Installation, Cutting and Flaring Work of Piping

Page 4

After 6 seconds, close the 2-way valve and make the inspection of gas leakage.

5.No gas leakage?

In case of gas leakage, tighten parts of pipe connection. If leakage stops, then proceed 6. steps

If it does not stop gas leakage, discharge whole refrigerants from the service

port. After flaring work again and vacuumize, fill up prescribed refrigerant from the gas cylinder.

6.Detach the charge hose from the service port, open 2-way valve and 3-way. Turn the valve rod anticlockwiseuntil hitting lightly.

7.To prevent the gas leakage, turn the service port’s cap, the valve rod’s cap for 2-way valve and 3-way’s a little more than the point where the torque increases suddenly.

8.After attaching the each caps, check the gas leakage around the caps.

Step 1.

2-way valve Liquid Side

Step 2.

 

 

 

3-way valve Gas Side

Open

 

Gaugemanifold(for R410A)

 

 

Anti countercurrent joint

Step 3.

 

 

Tube(for R410A) Vacuum pump(for R410A)

Close

 

Correct

Incorrect

 

Lean

Damage of flare Crack

Partial Too outside

3On Drainage

Please install the drain hose so as to be downward slope without fail.

Please don’t do the drainage as shown below.

Less than

 

 

5cm

 

It becomes

The end is imm-

It waves. The gap with the

There is the bad

high midway.

ersed in water.

ground is too smal

smell from a ditch

Please pour water in the drain pan of the indoor unit, and confirm that drainage is carried out surely to outdoor.

In case that the attached drain hose is in a room, please apply heat insulation to it without fail.

Refrigerant charge label

Contains fluorinated greenhouse gases

 

covered by the Kyoto Protocol

A

Step 4.

2-way valve

Step 6.

2-way valve

 

3-way valve

 

3-way valve

 

 

 

Open 90O

 

 

 

 

 

Step 7.

2-way valve

 

 

3-way valve

2-way valve 3-way valve

 

 

 

R410A

2

 

 

1

F

E

1=

2=

1+2=

kg B kg C

kg D

Valve rod cap

Valve rod cap

Service port cap

CAUTION

If the refrigerant of the air conditioner leaks, it is necessary to discharge all the refrigerant. Vacuumize first, then charge the liquid refrigerant into air conditio- ner according to the amount marked on the name plate.

Please do not let other cooling medium, except specified one (R410A), or air enter into the cooling circulation system. Otherwise, there will be abnormal high pressure in the system to make it crack and lead to personal injuries.

1 Power Source Installation

The power source must be exclusively used for air conditioner. (Over I0A)

In the case of installing an air conditioner in a moist place, please install an ea- rth leakage breaker.

For installation in other places, use a circuit breaker as far as possible.

2Cutting and Flaring Work of Piping

Pipe cutting is carried out with a pipe cutter and burs must be removed.

After inserting the flare nut, flaring work is carried out.

 

 

 

Flare tool for R410A

Conventional flare tool

 

 

 

 

 

Clutch-type

clutch-type(Rigid-type)

Wing-nut type (Imperial-type)

 

 

A

 

 

0~0.5mm

1.0~1.5mm

1.5~2.0mm

Flare tooling die

1.Cut pipe

2.Remove burs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.Insert the flare nut

4.Flare pipe

This product contains fluorinated greenhouse gases covered by the Kyoto Protocol. Do not vent into the atmosphere. Refrigerant type:R410A

GWP* value:1975 GWP=global warming potential Please fill in with indelible ink,

1 the factory refrigerant charge of the product

2 the additional refrigerant amount charged in the field and

1+2 the total refrigerant charge

on the refrigerant charge label supplied with the product.

The filled out label must be adhered in the proximity of the product charging port (e.g. onto the inside of the stop value cover).

Acontains fluorinated greenhouse gases covered by the Kyoto Protocol

Bfactory refrigerant charge of the product: see unit name plate

Cadditional refrigerant amount charged in the field

Dtotal refrigerant charge

Eoutdoor unit

Frefrigerant cylinder and manifold for charging

Check for Installation and Test Run

Please kindly explain to our customers how to operate through the instruction manual.

Check Items for Test Run

Put check mark in boxes

Gas leak from pipe connecting?

Heat insulation of pipe connecting?

Are the connecting wirings of indoor and outdoor firmly inserted to the terminal block?

Is the connecting wiring of indoor and outdoor firmly fixed?

Is drainage securely carried out?

Is the earth line securely connected?

Is the indoor unit securely fixed?

Is power source voltage abided by the code?

Is there any noise?

Is the lamp normally lighting?

Are cooling and heating (when in heat pump) performed normally? Is the operation of room temperature regulator normal?

4

Image 4
Contents Power Source Necessary Tools for InstallationSelection of Installation Place Accessory parts Selection of pipeInstallation of Outdoor Unit Connection of pipesConnection Attaching Drain-ElbowOn Drainage Power Source InstallationCutting and Flaring Work of Piping