Dometic VN 880, VN 830, VN 770 Installing the Cheb, Installing the Plenum on the Front of the Cheb

Page 14

Volvo L-5 A/C - Air Distribution System

Figure 13. Supply Air Distribution Plenum.

Installing the Plenum on the Front of the CHEB

Using a ¼" nutdriver, remove the plastic 5" or 7" oval hose adaptor. Find the 4"x 6" (or 4"x4") distribution plenum. Install the weather stripping on the contact surfaces and place over the hole on the unit. Reinstall the screws into the new plenum.

Installing the CHEB

Install the CHEB on the passenger side of the truck.

Locate the CHEB template (supplied with the unit) and position it with the “edge of the unit” 1-1½" from the factory HVAC unit mounting foot. The “edge of the

ENGLISH

unit” line with the notations for the quick connections should be nearest the bunk wall. The line of the “edge of the unit” should be approximately 5" from the bunk wall.

Mark for the two quick connect holes 3½" off the “edge of the unit” using the construction lines. Drill through the rubber mat with a 2½" hole saw (DO NOT DRILL THROUGH THE METAL). Then drill through the metal with a 1-7/8" holesaw.

Drill the drain hole with a 1-5/8" hole saw.

Drill for mounting brackets for the CHEB using the following recommnedations:

14

Image 14
Contents Installation Guidelines Page Contents Required Tools Installing the ControlInstalling the Qt Digital Display Mounting the Power Logic Box Mounting location for Power Logic BoxFastener location on Power Logic Box Routing CablesVolvo Ductwork Installing the Return Air VentInstalling the Supply Air Distribution Location of installed ductwork Removal of sensor Preparing for mounting the foot- well and air plenum Re-installing the FootwellCustom Air Distribution Plenum Preparing to install grills in footwell cover Cut with 3.5 holesaw Reciprocating With Drill with 4 hole saw Installing the Cheb Installing the Plenum on the Front of the ChebCheb installed in passenger luggage box View of supply ducting connected Installing the Condenser Condenser installed on mounting plateRouting the Refrigerant lines and condenser power cable Routing of refrigerent linesHeat shield installed Testing the installation Routing of refrigerant linesPage Page Page 2485 Rev