Volvo
INTRODUCTION
The instructions that follow represent years of development of parts and procedures that make the system perform well and appear
Figure 1. Typical Control Installation
Installing the Control
Mount the control in a place that provides the driver convenient access. An ideal location would be near the current HVAC controls.
Required Tools
•Drill motor
•Hole saws:
•Drill bits: 1/8", 5/32", 9/32"
•Nut drivers: 1/4", 3/8", 15/16"
•Phillips head screwdriver
•
•Torque wrench may be also be required
Installing the Qt Digital Display
Refer to the mounting instructions and template provided with your kit.
•Route the CXP cable through the wall and into the luggage compartment. Remove the factory HVAC control panel to do this.
•Route the CXP cable to the rear of the bunk for later connection.
ENGLISH |