Setup
5. Route power cable (3) up through cord grip (JC). | 7. Connect power wiring from 1L1 and 3L2 to terminal |
| blocks 1 and 3 in TB1. |
6.Connect other end of grounding wire to grounding lug nut (X) inside junction box (J).
TB1
J
X
C
3JC
D | 3L2 | 3L2 |
1L1
C
2
PE
ti20975a
FIG. 4: Heat Control Box Cable Connections
6 | 313258C |