Bard CH5S1, CH4S1, CH3S1 installation instructions Defrost Cycle, Defrost Control Board

Page 19

DEFROST CYCLE

The defrost cycle is controlled by temperature and time on the solid state heat pump control.

When the outdoor temperature is in the lower 40°F temperature range or colder, the outdoor coil temperature is 32°F or below. This coil temperature is sensed by the coil temperature sensor mounted near the bottom of the outdoor coil. Once coil temperature reaches 30°F or below, the coil temperature sensor sends a signal to the control logic of the heat pump control and the defrost timer will start accumulating run time.

After 30, 60 or 90 minutes of heat pump operation at 30°F or below, the heat pump control will place the system in the defrost mode.

During the defrost mode, the refrigerant cycle switches back to the cooling cycle, the outdoor motor stops, electric heaters are energized, and hot gas passing through the outdoor coil melts any accumulated frost. When the temperature rises to approximately 57°F, the coil temperature sensor will send a signal to the heat pump control which will return the system to heating operations automatically.

If some abnormal or temporary condition such as a high wind causes the heat pump to have a prolonged defrost cycle, the heat pump control will restore the system to heating operation automatically after 8 minutes.

The heat pump defrost control board has an option of 30, 60 or 90-minute setting. By default, this unit is shipped from the factory with the defrost time on the 60 minute pin. If circumstances require a change to another time, remove the wire from the 60-minute terminal and reconnect to the desired terminal. Refer to Figure 12.

There is a cycle speed up jumper on the control. This can be used for testing purposes to reduce the time between defrost cycle operation without waiting for time to elapse.

Use a small screwdriver or other metallic object, or another

¼inch QC, to short between the SPEEDUP terminals to accelerate the HPC timer and initiate defrost.

Be careful not to touch any other terminals with the instrument used to short the SPEEDUP terminals. It may take up to

10 seconds with the SPEEDUP terminals shorted for the speedup to be completed and the defrost cycle to start.

As soon as the defrost cycle kicks in remove the shorting instrument from the SPEEDUP terminals. Otherwise the timing will remain accelerated and run through the 1-minute minimum defrost length sequence in a matter of seconds and will automatically terminate the defrost sequence.

FIGURE 12 — DEFROST CONTROL BOARD

 

SW

SW

TIME (SEC)

 

1

2

 

OFF

OFF

30

LOW PRESSURE BYPASS TIMER SWITCH

ON

OFF

60

OFF

ON

120*

*(FACTORY SETTING 120 SECONDS)

ON

ON

180

 

OFF

 

 

 

 

ON

 

ACCUMULATED DEFROST TIME TIMER (FACTORY SETTING 60 MIN.)

MIS-2668 A

Manual 2100-455M

Page

19 of 28

Image 19
Contents Models CH3S1 CH4S1 CH5S1Contents For more information, contact these publishers Getting Other Information and PublicationsElectric Heat Table Heat Pump Wall Mount Model NomenclatureCH 4S 1 a X X XUnit Dimensions CH3S1 Unit DimensionsCH4S1 and CH5S1 Unit Dimensions Single Circuit Dual Circuit Electrical SpecificationsFilters Shipping DamageGeneral Duct WorkMounting the Unit OPTiOnal top outlet flangeCH3S1 Wall Mounting Instructions CH4S1 and CH5S1 Wall Mounting Instructions Electric Heat Clearance Optional Clearance RecommendedReturn Opening Wall Mounting InstructionsCommon Wall Mounting Installations False Wall InstallationThermostat Wire Size Wiring Main PowerTAP Range Application Low voltage connectionsPressure Service Ports Important Installer NoteStart UP cont’d COmpressor current & pressure control module Phase MonitorService Hints Sequence of OperationDefrost Control Board Defrost CycleManual 2100-455M Troubleshooting Solid State Heat Pump Control Troubleshooting ProcedureTemperature F VS Resistance R of Temperature Checking Temperature Sensor Outside Unit CircuitRefrigerant CHARGe FAN Blade Setting DimensionsCompressor SOlenoid Removal of FAN ShroudMaximum ESP of Operation Indoor Blower PerformancePressure Table TemperaturePressure Table Symptom Cause/Procedure Troubleshooting GE ECM MotorsReplacing ECM Control Module Troubleshooting GE ECM Motors Contd
Related manuals
Manual 25 pages 23.1 Kb Manual 14 pages 10.23 Kb

CH3S1, CH5S1, CH4S1 specifications

Bard CH3S1, CH4S1, and CH5S1 represent a formidable trio of advanced technologies in the field of AI-driven natural language processing. These models are designed to facilitate seamless communication, enhance productivity, and deliver personalized experiences across various applications.

One of the main features of the Bard CH series is its ability to understand and generate human-like text. This is achieved through deep learning algorithms that analyze vast datasets to learn language patterns, context, and nuances. The CH3S1 model, for instance, excels in basic conversational tasks, making it suitable for customer support, virtual assistants, and simple content generation. Its training allows it to respond efficiently to user inputs while maintaining clarity and engagement.

As we progress to the CH4S1 model, we observe significant enhancements in contextual understanding. This model can handle more complex conversations, making it adept at tasks requiring greater cognitive processing, such as technical support and nuanced dialogue-based applications. The increased parameter count and refined training methods contribute to its ability to grasp intricate sentence structures and varied linguistic styles, leading to more coherent and relevant responses.

Building upon the capabilities of its predecessors, the CH5S1 model represents the pinnacle of the Bard CH series. It integrates advanced features such as multi-modal processing, allowing it to work with text, images, and even sound. This model is engineered to perform in more specialized fields, such as healthcare, legal, and creative writing, where precise language and context are critical. The CH5S1 leverages feedback loops from real-time interactions to continuously improve its understanding and output, making it not only a tool for communication but also an intelligent partner for businesses and individuals alike.

In terms of technology, all three models utilize transformer architecture, which has proven effective in tasks requiring attention and context retention. They also implement reinforcement learning techniques to adapt and refine their models based on user engagement data. Furthermore, security and data privacy are prioritized, with strict adherence to ethical AI guidelines to ensure user trust.

Overall, the Bard CH series signifies a leap forward in artificial intelligence, combining advanced linguistic capabilities with a user-centric approach, thus redefining how we interact with machines and enhancing our digital experiences.