Delta DBS125, DNS100, DBN125 instruction manual Preparing the Tool

Page 8

PREPARING THE TOOL

1.After reading and understanding this entire manual, connect tool to air supply (Fig. 18).

2.Depress latch and slide magazine cover open (Fig. 19).

3.Insert a strip of approved fasteners (Fig. 20 and/or Fig. 20A). Orient fasteners with points down in the magazine. NOTE: Brad nails are side loaded and staples are top loaded.

4.Push magazine cover closed (Fig. 21).

5.Observe the low fastener indicator (A) Fig. 22 and reload as needed.

6.Adjust directional exhaust deflector (A) Fig. 23, so that the exhaust air or debris will be directed away from the operator. Grasp the deflector and rotate it to the desired position for the current application.

Fig. 18

Fig. 19

Fig. 20

Fig. 20A

Fig. 21

A

Fig. 22

A

Fig. 23

8

Image 8
Contents Brad Nailer/Stapler Date of Manufacture Safety Guidelines / Definitions Important Safety InstructionsGeneral Safety Rules Page Page Functional Description Power SourceEMPLOYER’S Responsibilities Preparing the Tool Using the Tool Operating InstructionsRubber Nose Cushion Clearing a Jammed Fastener Service and Repairs MaintenanceClean and Inspect Daily Troubleshooting Symptom ProblemsTwo Year Limited New Product Warranty AccessoriesCanadian PORTER-CABLE Delta Service Centers