Emerson CF552AW00, CF552GES00, CF552ORB00, CF552GBZ00, CF552WB00 owner manual Pin

Page 6

12.Remove the hanger ball by loosening the setscrew in the hanger ball until the ball falls freely down the downrod (Figure 7). Remove the pin from the downrod, then remove the hanger ball. Retain the pin and hanger ball for reinstallation in Step 15.

 

PIN

 

HANGER

 

BALL

DOWNROD

 

Figure 7

SETSCREW

 

13.Separate, untwist and unkink the three 80” motor leads. Route the motor lead wires through the downrod. Remove the upper setscrew from the motor coupling. Align the clevis pin holes in the downrod with the holes in the motor coupling. Install the clevis pin and secure with the hairpin clip (Figure 8). The clevis pin must go through the holes in the motor coupling and the holes in the downrod. Be sure to push the straight leg of the hairpin clip through the hole near the end of the clevis pin until the curved portion of the hairpin clip snaps around the clevis pin. The hairpin clip must be properly installed to prevent the clevis pin from working loose. Pull on the downrod to make sure the clevis pin is properly installed. Reinstall the upper setscrew in the motor coupling. Check that the lower setscrew is tightened securely (Figure 8).

NOTE: The setscrews must be properly installed as described above, or fan wobble could result.

!WARNING

It is critical that the clevis pin in the motor coupling is properly installed and the setscrews securely tightened. Failure to verify that the pin and setscrews are properly installed could result in the fan falling.

CEILING

COVER

DOWNROD

COUPLING COVER

14.Make sure the grommet is properly installed in the coupling cover, then slide the coupling cover on the downrod until it rests on the motor housing. Place the ceiling cover over the downrod. Be sure that the ceiling cover and the coupling cover are both oriented correctly (Figure 9).

CEILING

COVER

DOWNROD

COUPLING COVER

Figure 9

15.Reinstall the hanger ball (Figure 10) on the downrod as follows. Route the three 80” motor leads through the hanger ball. Position the pin through the two holes in the downrod and align the hanger ball so the pin is captured in the groove in the top of the hanger ball. Pull the hanger ball up tight against the pin and securely tighten the setscrew in the hanger ball. A loose setscrew could create fan wobble.

!WARNING

It is critical that the pin in the hanger ball is properly installed and the setscrew securely tightened. Failure to verify that the pin and setscrew are properly installed could result in the fan falling.

PIN

HANGER BALL

CEILING

COVER

SETSCREW

Figure 10

16.The fan comes with blue, black and white leads that are 80” long. Before installing fan, measure up approximately 6 to 9-inches above top of hanger ball/downrod assembly. Cut off excess leads and strip back insulation 1/2-inch from end of leads.

Figure 8

17.You have now completed the assembly of your new ceiling fan. You can now proceed with

6 hanging and wiring your fan.

Image 6
Contents Carrera Veranda Safety Instructions Unpacking Instructions How to Put Your Ceiling Fan Together Electrical RequirementsBLADE/FLANGE Assembly PIN How to Hang Your Ceiling Fan How to Wire Your Ceiling Fan Two knurled knobs supplied. FigureUsing Your Ceiling Fan MaintenanceAccessories Trouble Shooting Energy Efficient Use of Ceiling FansRepair Parts Listing DescriptionLimited Warranty