Chief Manufacturing CTA-025 Tools Required for Installation, Instructions, Installing Wall Arm

Page 5

Installation Instructions

CTA-025

TOOLS REQUIRED FOR

INSTALLATION

The tools required for installation are as follows:

Electric drill and bit set

Stud sensor (mechanical or electronic)

½” box-end wrench or ratchet with ½” socket

13mm box-end wrench or ratchet with 13mm socket

Level

NOTE: Other tools may be required depending on your method of installation.

INSTRUCTIONS

Step 1

Installing Wall Arm

1.Locate the wall arm (10), two lag bolts (30) and two flat washers (40). See Figure 2.

WARNING

It is the installer’s responsibility to verify that the structure to which the mount is anchored will safely support five times the combined load of all attached components and equipment.

2.Determine a suitable mounting location. Keep in mind that you will be mounting the wall arm (10) to a wood stud, on center.

3.Using a stud sensor, locate the wood stud where you will mount the wall arm (10).

4.Holding the wall arm (10) against the wall, use a pencil, awl, or small nail to mark the mounting holes where two pilot holes will be drilled into the center of the wood stud. Make sure that the mounting holes are centered.

5.Using a 15/64” drill bit, drill two pilot holes for anchoring the wall arm (10).

6.Using two 5/16” lag bolts (30) and two 5/16” flat washers (40), install the wall arm (10) on the wall.

Wall Stud

(40)

(30)

(10)

Figure 2. Install Wall Arm

5

Image 5 Contents
Chief Manufacturing INC CTA-025Length CTA-025 Specifications CTA-025 SpecificationsInspect the Unit Before Installing ContentsCTA-025 Parts PartsInstructions Tools Required for InstallationInstalling Wall Arm Attaching Front Cover Connecting NPT Pipe or Nipple to Wall ArmStep
Related manuals
Manual 6 pages 52.28 Kb