assembly
7, The Front Charmer should be slightly lower than the top of the Vertical Channels. Check the height with a
combination square as shown. If it is higher, loosen the Flange Nuts and lower it.
TOOL HOLDER
1. Screw | a | into | / |
each | Knob as shown. |
|
|
SET SCREW WRENCH
/
/
DOTS
2.Screw a Square Nut onto each of the Follower Pins. NOTE: The Nut has four clots on one side., .they must face the threaded end.