2-10. Placing Jumper Links And Connecting Input Power
200 VOLTS | 230 VOLTS |
| 460 VOLTS | ||
L | L | L | L | L | L |
|
|
|
| ||
230 VOLTS |
| 460 VOLTS |
| 575 VOLTS | |
L | L | L | L | L | L |
|
|
|
|
| |
220 VOLTS |
| 380 VOLTS |
| 415 VOLTS | |
L | L | L | L | L | L |
1
Tools Needed:
3/8 in
3/8, 1/2, 7/16 in
Check input voltage available at site.
1 Jumper Link Label
Check label – only one is on unit.
2 Jumper Links
Move jumper links to match input voltage.
3 Input And Grounding
Conductors
Select size and length using
Section
| 4 Line Disconnect Device | |
| Select type and size of overcurrent | |
| protection using Section | |
| Reinstall side panel. | |
| Y Special installation may be | |
2 | required where gasoline or | |
volatile liquids are present – | ||
| ||
| see NEC Article 511 or CEC | |
| Section 20. |
GND/PE
Earth Ground
4
L2 (V)
L1 (U)
3