Powermatic 4224B operating instructions Tool caddy, Brackets, Lamp holder set, Guard

Page 12

8.With assistance, raise bed and leg assembly right-side up.

Bed and leg assembly is heavy. Use care when lifting.

9.Rotate the leveling feet as needed to establish level for the lathe.

10.Install headstock, toolrest base and tailstock, and both stop bolts (B, Figure 3).

7.5Tool caddy

Install tool caddy (Figure 7) to either end of lathe with two screws and washers (HP-5/6). The left end, near the headstock, is generally preferred. The tool caddy has holes for placing knockout rod, centers, faceplate wrench, air adaptors, etc. Accessories can also be stored in the tailstock cavity.

Figure 7

7.6Brackets

1.Install guard bracket (C, Figure 8) with two screws and lock washers (HP-2/3).

2.Install comparator bracket (D, Figure 8) to tailstock with fasteners (HP-1/3/4). The bracket holes are slotted for alignment with guard bracket.

3.Install locking handle (E, Figure 8).

See section 9.11, “Comparator” for further information.

Figure 8

7.7Lamp holder set

1.Install shaft of lamp holder (F, Figure 9) into guard bracket hole, and tighten handle (G).

2.Install collar (H) beneath and tighten set screw on collar.

Figure 9

To install lamps:

3.Insert stud (J, Figure 10) into plate and secure with lock washer and nut (K/L).

4.Lift up collar (M) on lamp arm while pushing arm down completely onto stud. Push collar back down to secure.

Figure 10

7.8Guard

The guard must always be used in operations that will allow its use.

See Figure 11.

1.Loosen set screw of outer collar (N) and remove collar.

2.Insert guard support rod into guard bracket while lifting up on plunger (O). Release plunger and it will snap into position as you slide support rod farther in.

3.Reinstall collar (N) on end of guard support rod and tighten set screw.

12

Image 12
Contents Powermatic Part No. M-1794224BWarranty and Service Warranty PeriodTable of contents 17.3.2 Safety warnings About this manual Features Specifications Subject to local/national electrical codes Dimensions Setup and assembly Shipping contentsTools required for assembly Unpacking and cleanupInstalling legs Bed and leg assembly is heavy. Use care when lifting Tool caddyBrackets Lamp holder setOptional accessories Installing Bed Extension only p/nAir/vacuum system 10.1 20-inch Bed Extension10.2 20 Bed Extension Kit User-made shelf assembly 10.3 63-inch Bed ExtensionShelf Style 1 Figure Shelf Style 2 FigureSingle phase operation Three phase operationElectrical connections Variable frequency driveAdjustments Extension cordsHeadstock/tailstock movement Cam tightnessTool support Locking handlesLive center and cone IndexerCenters Installing/removing Face plate Installing/removingVacuum chuck Installing/removing Spindle lockSpeed change Checking spindle playSheave/drive belt replacement Sheave and belt alignmentOperating controls OperationInspection Turning ToolsSpindle Turning Stock SelectionCutting Techniques Roughing OutFace Plate and Bowl Turning Mounting Stock Faceplate or Chuck?Wood Selection Checks and CracksBowl Turning Techniques To Shape Outside of BowlTo Shape Interior of Bowl Maintenance Page Troubleshooting the 4224B TroubleProbable Cause Remedy Belt Positions for 4224B Replacement Parts Headstock Assembly Exploded View Headstock Assembly Parts List Index No Description Size QtyIndex No. Part No Description Size ’ty Bed and Leg Assembly Exploded View Bed and Leg Assembly Parts List 4224B-263 Hex Nut 6294773 TS-0207071 Socket Head Cap Screw Lamp Holder Set Exploded View Lamp Holder Set Parts List Lamp Kit Parts ListIndex No. Part No Description Size Qty Vacuum System Exploded View Vacuum System Parts List Vacuum Chuck Assembly includes #42 thruPage Extension Bed Kit includes #1 thru 4224B-262 Leveling Foot 4224B-263 Hex Nut Index No Description Size Qty 6295898 Offset Tool Support Casting Electrical Connections 4224B Lathe
Related manuals
Manual 52 pages 37.52 Kb