OPERATION
MACHETE 2 11/08 Operation Section 3-13
©2008 Alamo Group Inc.
OPERATION
B
OO
M ARM A
SS
EMBLY
Inspect condition of each arm se ction weldment
Ensure all pins ar e in pla ce .
Ensure all bolts and screws are properly
installed.
Check condition of teflo n bushings at boom
pivot points.
Ensure each hydraulic cylin der is insta lled and
retained correctly. Ensur e the pr op er size pin s
are used to ret ain the cylinders in place and are
secured prop erly. OPS-B- 0022
Never attempt to lubricate, adjust, or remove material from the Implement while it is in
motion or while tractor engine is running. (SG-20)
HYDRAULI
C
LINE IN
S
PE
C
TI
O
N
Check for hydr au lic lea ks alon g ho se s,
cylinders and fittings. IMPORTANT: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.
Inspect the condition of the valve weldment.
Ensure fitting is properly connected
Inspect condition of nylon bushings.
OPS-B- 0023
Do not operate this Equipment with hydraulic oil or fuel leaking. Oil and
fuel are explosive and their presence could present a hazard. Do not
check for leaks with your hand! High-pressure oil streams from breaks in
the line could penetrate the skin and cause tissue damage including
gangrene. To check for a hose leak, SHUT the unit ENGINE OFF and
remove all hydraulic pressure. Wear oil impenetrable gloves, safety
glasses and use Cardboard to check for evidence of oil leaks. If you
suspect a leak , REMOVE the HOSE an d have it tested at a Dealer. If oil
does penetrate the skin, have the injury treated immediately by a
physician knowledgeable and skilled in this procedure. (SG-15)