Start-Up
The following assumes that all connections are tight.
System Start-Up Instructions
1.Select a clean dry air supply.
2.Attach a 3/8” or larger air hose to the Air Manifold Inlet. 'RQRWXVHTXLFNGLVFRQQHFW¿WWLQJV
3.Attach grounding clamp assembly, P/N
Before turning on main air, check all On/Off Ball Valves, making certain all Valves are in the “Off” position and set all regulators in their “Off” position. (Turn knob counter- clockwise for OFF or reduced pressure setting.)
5.Place the mixing element straight into the front gun housing. (refer to spray gun user manual)
6.Place the retaining nut along with the spray tip and spray tip spacer onto the gun housing. (refer to spray gun user manual)
7.Push the slide valve to the open position.
Attach Here | 8. 2SHQWKHDLUYDOYHSQRQWKHVROYHQWWDQNDQG | |
adjust the solvent pressure to 90 PSI (6.2 bar). Open | ||
|
WKHEDOOYDOYHSQRQWKHVROYHQWWDQN1H[W
open ball valve p/n
VROYHQWZLOOÀRZRXWRIWKHIURQWRIWKHJXQWKURXJKWKH
dispense tip, then close the valve.
Do not exceed 20 PSI (1.4 bar)on the material
UHJXODWRUXQWLODVWHDG\PDWHULDOÀRZKDVEHHQ
established.
4.Securely attach Clamp, P/N
Regulator
Valve | Ball valve |
| 3165 |
Attach
Here
TO SLAVE PUMP
20 |