Set-Up
6\VWHP$VVHPEO\ | 2. a. Stand the pump assembly next to the mast and |
| LQVWDOOWKHSXPSPRXQWLQJEUDFNHW |
$Q\PRXQWLQJRSWLRQFDUWPDVW ERRPÀRRUPRXQW or wall mount etc. should be completely assembled
before starting the following steps.
Tools Required:
6WDQGDUGZUHQFK VRFNHWVHW
6WDQGDUGKH[NH\VHW 3) Tape measure
All “Required tools” are standard sizes.
1.Loosen clamp bolts to expose pump mounting
EUDFNHW$WWDFKSXPSPRXQWLQJEUDFNHWWRWKHDLU
PRWRU8VHWKUHDGORFNHURQWKHWKUHDGVDQGWLJKWHQ
KH[EROWVDVWLJKWDVSRVVLEOHLQKH[NH\
HEX BOLTS
E Lift to desired height with the pump assembly facing the front of the cart as shown, approximately 41in. from the top of the cart to the top of the pump mount-
LQJEUDFNHW8VHLQZUHQFKDQGWLJKWHQDVWLJKWDV
possible.
41in./104 cm.
APPROX.
7 |