Carrier 38AKS028-044 dimensions Preliminary Information, Pre-Start-Up, Remove and store in job le

Page 23

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

LINE

- -

DOTTED - - - -

ALONG

- - -

CUT

- -

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

 

 

 

 

 

 

 

 

 

 

START-UP CHECKLIST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Remove and store in job ®le)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A. Preliminary Information

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OUTDOOR: MODEL NO.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERIAL NO.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INDOOR: AIR HANDLER MANUFACTURER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MODEL NO.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERIAL NO.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ADDITIONAL ACCESSORIES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B. Pre-Start-Up

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OUTDOOR UNIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS THERE ANY SHIPPING DAMAGE?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IF SO, WHERE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WILL THIS DAMAGE PREVENT UNIT START-UP?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT?

 

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAS THE GROUND WIRE BEEN CONNECTED?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE COMPRESSOR HOLDDOWN BOLTS BEEN LOOSENED?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONTROLS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE THERMOSTAT AND INDOOR FAN CONTROL WIRING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTIONS MADE AND CHECKED?

 

 

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE ALL WIRING TERMINALS (including main power supply) TIGHT?

 

 

 

 

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAS CRANKCASE HEATER BEEN ENERGIZED FOR 24 HOURS?

 

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INDOOR UNIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DRAINAGE?

 

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE PROPER AIR FILTERS IN PLACE?

 

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER ALIGNMENT?

 

 

(Y/N)

 

 

 

 

 

 

DO THE FAN BELTS HAVE PROPER TENSION?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PIPING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE LIQUID LINE SOLENOID VALVE(S) LOCATED AT THE EVAPORATOR COIL AS REQUIRED?

(Y/N)

 

 

HAVE LEAK CHECKS BEEN MADE AT COMPRESSOR, CONDENSER, EVAPORATOR,

 

 

 

 

 

 

 

 

 

 

 

 

 

TXVs (Thermostatic Expansion Valves), SOLENOID VALVES, FILTER DRIERS, AND FUSIBLE PLUGS

 

 

 

 

 

 

WITH A LEAK DETECTOR?

 

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCATE, REPAIR, AND REPORT ANY LEAKS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE ALL COMPRESSOR SERVICE VALVES BEEN FULLY OPENED (BACKSEATED)?

(Y/N)

 

 

 

 

 

 

ARE THE COMPRESSOR OIL SIGHT GLASSES SHOWING ABOUT 1¤2 FULL?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

CHECK VOLTAGE IMBALANCE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LINE-TO-LINE VOLTS:

AB

 

 

 

V

 

 

 

AC

 

 

 

 

 

V

 

 

 

 

 

 

BC

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(AB + AC + BC)/3 = AVERAGE VOLTAGE =

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MAXIMUM DEVIATION FROM AVERAGE VOLTAGE =

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VOLTAGE IMBALANCE = 100 X (MAX DEVIATION)/(AVERAGE VOLTAGE) =

 

 

%

 

 

 

 

 

 

 

 

 

 

 

 

 

IF OVER 2% VOLTAGE IMBALANCE, DO NOT ATTEMPT TO START SYSTEM!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CALL LOCAL POWER COMPANY FOR ASSISTANCE.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CL-1

Image 23
Contents Before Installation ContentsSafety Considerations Ð Physical Data Ð SI Ð Physical Data Ð English38AKS Units InstallationCompressor Mounting 38AKS Unit Length of Interconnecting PIPING, FT MÐ Refrigerant Piping Sizes Ð 60 Hz Ð Refrigerant Piping Sizes Ð 50 HzElectrical Data 50-75 Length Insulated Wire Size AWGMm2 38AKS034C 38AKS02838AKS028C 38AKS03438AKS044C 2745 1246 38AKS044 2437LLS1 AFSEquip GNDLlsv BPRTransformer Time Delay RelayTDR TranInitial Check START-UP38AKS028 Charging Chart, 50/60 Hz 38AKS034 Charging Chart, 50/60 Hz 38AKS044 Charging Chart, 50/60 Hz Complete Unit Stoppage ServiceAccess for Servicing See Fig 38AKS Unit with Access Panels Removed 06E9299 Compressor Amount06E9265 06E9275Fan Cycling Controls Pressure Switch Settings, psig kPaMinimum Outdoor-Air Operating Temperature Compressor Stops on LOW-PRESSURE Control TroubleshootingPackaged Service Training Remove and store in job le Preliminary InformationPre-Start-Up OIL Level AT 1¤ 8 to 1¤ 3 FULL? Start-Up