Harbor Freight Tools 45689 operating instructions Retighten the four Cap Screws parts #3, #11

Page 6

10.Retighten the four Cap Screws (parts #3, #11).

 

 

 

 

 

 

 

 

CAP

 

 

 

 

OPERATING

SCREW

 

 

 

 

(#3)

 

 

 

 

 

 

LEVER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(#5)

 

 

 

 

 

 

 

TOP TONG

 

 

 

 

 

 

 

HOLDER (#12)

 

 

 

 

 

 

BOTTOM TONG

 

 

 

 

 

 

 

 

 

 

CLAMP (#35)

 

 

 

 

 

 

 

 

 

 

UPPER

 

 

 

 

 

 

 

 

 

 

 

TONG

 

 

 

 

 

 

 

 

HEX JAM NUT (#10)

(#46)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEX JAM NUT (#10)

TONGTIP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEX NUT (#20)

(#48)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TONG

 

 

TOP TONG

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CLAMP (#13)

 

 

 

 

 

 

 

INSULATOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOWER

(#33)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TONG

 

 

 

 

 

 

 

 

 

 

 

(#47)

 

 

CAP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCREW

 

 

 

 

 

FIGURE A

 

 

 

(#34)

 

 

 

 

 

 

TONG ALIGNMENT

UPPER TONG (#46)

UPPER TONG (#46)

 

TONG TIPS (#48)

TONG TIPS (#48)

LOWER TONG (#47)

LOWER TONG (#47)

FIGURE B

To Attach The Handle To The Spot Welder:

1.To attach the Wooden Handle (part #17) to the Spot Welder, insert the Bolt (part #19) through the following parts in this order: through a Handle Bracket (part #18), through the Wooden Handle, and through the remaining Handle Bracket. Then, secure the parts together, using the Lock Washer (part #49) and Hex Nut (part #20). (See Figure C, and

Assy. Diagram.)

SKU 45689

For technical questions, please call 1-800-444-3353.

Page 6

Image 6
Contents Spot Welder General Safety Warnings and Precautions Save this ManualSpecific Product Warnings and Precautions Figures A, B, E, and Assy. Diagram Assembly Instructions UnpackingTo Attach The Upper And Lower Tongs Retighten the four Cap Screws parts #3, #11 To Attach The Handle To The Spot WelderFigure C To Attach Tong Tips To The Spot WelderTo Adjust The Tong And Operating Lever Pressure Operating InstructionsTo Use The Power Switch To Use The Operating LeverFor technical questions, please call Please Read the Following Carefully Parts List Assembly Diagram Limited 1 Year / 90 day warranty Mission Oaks Blvd. PO Box 6009 Camarillo, CA 93011 800