COOLING-ONLY PROCEDURE
NOTE: If superheat- or
EXAMPLE:
To calculate additional charge required for a
25 ft – 15 ft = 10 ft X 0.6 oz/ft = 6 oz of additional charge
HEATING CHECK-CHART PROCEDURE
To check system operation during heating cycle, refer to the Heating Check Chart on outdoor unit. This chart indicates whether a correct relationship exists between system operating pressure and air temperature entering indoor and outdoor units. If pressure and temperature do not match on chart,
NOTE: When charging is necessary during heating season, charge must be weighed in accordance with unit rating plate ±0.6 oz/ft of
Step 14—Final Checks
IMPORTANT: Before leaving job, be sure to do the following:
1.Securely fasten all panels and covers.
2.Tighten service
3.Leave User’s Manual with owner. Explain system operation and periodic maintenance requirements outlined in manual.
4.Fill out Dealer Installation Checklist and place in customer file.
A00010
Table 2—Phase-Monitor LED Indicators
LED | STATUS | |
OFF | No call for compressor | |
operation | ||
| ||
FLASHING | Reversed phase | |
ON | Normal |
Fig. 7—Phase-Monitor Control
5