Yazoo/Kees Z9A manual Unpacking Instructions, Frame Assembly

Page 7

ASSEMBLY

Unpacking Instructions

1.Wear gloves and eye protection. Remove wood pieces.

2.Cut straps around carton and remove top.

NOTE: Watch for nails and wood splinters.

3.Slide carton sleeve out of bottom tray and lift over Z9.

Assembly Instructions

Frame Assembly

Tools Required:

1.3/4" wrench

2.Ratchet

3.3/4" socket

Lower

 

Frame

Upper

 

Frame

1.Position the Lower Frame inside the Upper Frame.

2.Align holes corresponding to desired position of frame.

3.Secure with eight (8) 1/2” x 1-1/4” hex bolts and eight (8) 1/2” nylon lock nuts.

7

Image 7
Contents Z9 Commercial Collection System Operators Guide IndexSpecifications Features & Controls General Information Safety RulesOperation Frame Assembly AssemblyUnpacking Instructions Mounting the Z9 Spindle Drive Drive Kit Assembly Hose Trimming Operating the Vacuum OperationTransport Service and MaintenanceCleaning and Washing Preventative Maintenance ScheduleCaring For Vacuum Hoses Cleaning Exhaust Screen Troubleshooting Guide Parts Illustration Container Assembly QTY Description Frame Assembly Hitch & Front Weight BAR Assembly Spindle Drive Assembly FAN Cover W/DECALS Drive KIT Assembly Page Toll Free Phone 877 368-TURF