Condensing Unit Placement

Space and Location Requirements

The most important consideration which must be taken into account when deciding upon the location of air- cooled equipment is the provision for a supply of ambient air to the condenser, and removal of heated air from the condensing unit or remote condenser area. Where this essential requirement is not adhered to, it will result in higher head pressures, which cause poor operation and potential failure of equipment. Units must not be located in the vicinity of steam, hot air or fume exhausts. Corrosive atmospheres require custom designed condensers.

Another consideration which must be taken is that the unit should be mounted away from noise sensitive spaces and must have adequate support to avoid vibration and noise transmission into the building. Units should be mounted over corridors, utility areas, rest rooms and other auxiliary areas where high levels of sound are not an important factor. Sound and structural consultants should be retained for recommendations. (Refer to actual building plans for unit locations.)

Figure 2. Condensing Unit Placement

 

 

 

 

 

 

 

 

3 Feet

 

 

 

 

 

(minimum)

 

 

 

 

 

Clearance to

 

 

3 Feet from

 

 

the Next Unit

 

 

Building

 

 

 

 

 

 

 

 

 

Wall

 

 

 

 

 

 

3Feet

(minimum)

Clearance from unit to an Open Block Wall or Shrubs.

3 Feet

(minimum)

Clearance for Contractor to Service Unit.

6

Image 6
Contents Table of Contents General Safety Information NomenclatureInspection Compressor Module Specifications Hermetic Compressor Module Electrical DataScroll Compressor Module Electrical Data Dimensional Diagrams One Fan Top View End ViewCondensing Unit Placement Space and Location RequirementsCondensing Unit Rigging Condensing Unit RiggingRefrigeration Piping And Line Sizing Refrigeration Piping And Line SizingRefrigeration Piping Suction LinesSuction Line Risers Example Pipe Support Line InsulationLeak Testing Leak Detection And EvacuationEvacuation Field Wiring Refrigeration Charging Refrigeration ChargingCheck-Out & Start-Up Operational Checkout System BalancingPreventive Maintenance Preventive Maintenance Preventive Maintenance Replacement Parts Replacement Parts ListWiring DiagramWiring Diagram Start-up Checklist PipingRecord Page Page FlexPack