Ryobi R1801M1, R181FB1 manual Symbols, Symbol Name DESIGNATION/EXPLANATION

Page 5

SYMBOLS

Some of the following symbols may be used on this tool. Please study them and learn their meaning. Proper interpreta- tion of these symbols will allow you to operate the tool better and safer.

SYMBOL

NAME

DESIGNATION/EXPLANATION

V

Volts

Voltage

A

Amperes

Current

Hz

Hertz

Frequency (cycles per second)

W

Watt

Power

min

Minutes

Time

 

Alternating Current

Type of current

---

Direct Current

Type or a characteristic of current

no

No Load Speed

Rotational speed, at no load

 

Class II Construction

Double-insulated construction

.../min

Per Minute

Revolutions, strokes, surface speed, orbits etc., per minute

 

Wet Conditions Alert

Do not expose to rain or use in damp locations.

 

Read The Operator’s Manual

To reduce the risk of injury, the user must read and understand

 

the operator’s manual before using this product.

 

 

 

Eye Protection

Always wear safety goggles or safety glasses with side shields

 

and a full face shield when operating this product.

 

 

 

Safety Alert

Precautions that involve your safety.

 

No Hands Symbol

Failure to keep your hands away from the blade will result in

 

serious personal injury.

 

 

 

No Hands Symbol

Failure to keep your hands away from the blade will result in

 

serious personal injury.

 

 

 

No Hands Symbol

Failure to keep your hands away from the blade will result in

 

serious personal injury.

 

 

 

No Hands Symbol

Failure to keep your hands away from the blade will result in

 

serious personal injury.

 

 

5

Image 5
Contents Save this Manual for Future Reference Operators ManualIntroduction Table of ContentsElectrical Safety General Safety RulesPersonal Safety Work AreaAdditional Safety Rules Specific Safety RulesService Symbol Name DESIGNATION/EXPLANATION SymbolsSymbol Meaning ServiceDouble Insulation ElectricalElectrical Connection Extension CordsFeatures Instructions UnpackingTurning the Router ON/OFF OperationOperating the Router OFFTo Install the Router Base Removing and Installing the Router BaseIndicator Point To Remove the Router BaseLoosen Tighten Gold Spindle Lock Button REMOVING/INSERTING CuttersLocking ARM Adjusting Depth of CUTDepth Indicator Ring Adjustment Arrow Direction External Feeding the RouterDirection Internal Guide Outside BIT Rotation Thrust Feedguide Guide InsideTOO Fast TOO Slow Rate of FeedRouting Determining Depth of CUTPass Width CUT 2ND. Pass PassRouting by Freehand Router Work Pilot Guide Edging with PilotsRouter Pilot Work Accessories MaintenanceService Model NO. and Serial no