SECTION 5: SET UP
About this Section | Unpacking | |
|
|
|
|
|
|
|
|
|
|
|
|
The purpose of this section is to guide you through the required steps to get your machine out of its crate and into operating condition.
This machine presents serious injury hazards to untrained users. Read through this entire man- ual to become familiar with the controls and operations before start- ing the machine!
Wear safety glasses dur- ing the entire set up pro- cess!
Your machine was carefully packed when it left our warehouse. If you discover the machine is damaged after you have signed for delivery, please immediately call our Customer Service at (570)
Save the containers and all packing materials for possible inspection by the carrier or its agent. Without the packing materials, filing a freight claim can be difficult. If you need assistance determin- ing whether you need to file a freight claim, or with the procedure to file one, please contact our Customer Service at (570)
These Planers are heavy machines, up to 1853 lbs. shipping weight. DO NOT
When you are completely satisfied with the con- dition of your shipment, you should inventory its parts.
Extreme Duty Planers |