Grizzly G0675 owner manual Setting Fence Stops

Page 46

6. Edh^i^dc i]Z `c^[Z \Vj\Z dkZg i]Z `c^[Z Vh h]dlc^cFigure 65VcYaddhZci]Z\^WWdaih jci^ai]Z`c^[Z^hXdbeaZiZanaddhZ#

7. Jh^c\ V *bb ]Zm lgZcX]! gdiViZ i]Z _VX` hXgZlh Figure 67 ^c i]Z VXXZhh ]daZh id gV^hZdgadlZgi]Z`c^[Z#L]Zci]Z`c^[Z^hhZi XdggZXian!^il^aaWVgZanidjX]i]ZWdiidbZY\Z d[i]Z`c^[ZhZii^c\\Vj\ZdcWdi]h^YZhd[i]Z XjiiZg]ZVYl]Zc^i^hgdiViZYWVX`VcY[dgi]# Hcj\ i]Z \^W Wdaih i^\]i Zcdj\] id _jhi ]daY i]Z`c^[Z^ceaVXZ#GZeZViSteps 5-7l^i]i]Z gZbV^c^c\`c^[Z#

Figure 67.?VX`hXgZlVXXZhh]daZ#

8. GdiViZ i]Z XjiiZg]ZVY id i]Z [^ghi `c^[Z ndj VY_jhiZY# Ha^\]ian i^\]iZc Vaa i]Z \^W Wdaih! hiVgi^c\Vii]Zb^YYaZVcYldg`^c\ndjglVnid i]ZZcYhWnVaiZgcVi^c\aZ[iVcYg^\]iFigure 68#GZeZVii]^hhiZedci]ZgZbV^c^c\`c^[Z#

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*

(

&

'

)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 68.<^WWdaii^\]iZc^c\hZfjZcXZ#

9. GZeZVi Step

8! Wji [^cVa i^\]iZc ZVX] \^W

 

Wdai#

 

 

 

 

 

 

 

 

 

 

 

10. GZeaVXZi]ZgZVgVXXZhheVcZa!WaVYZ\jVgY! VcY[ZcXZ#

Setting Fence Stops

I]Z[ZcXZhidehh^bea^[ni]ZiVh`d[VY_jhi^c\i]Z [ZcXZid)*ßVcY.%ß#

Tools NeededQty

)*•HfjVgZ######################################################## &

.%•HfjVgZ######################################################## & Ha^Y^c\7ZkZa###################################################### & =ZmLgZcX](bb############################################## & =ZmLgZcX],bb############################################## &

GZ[ZgidFigures 69-70id^YZci^[ni]Z.%ßVcY)*ß [ZcXZhideXdbedcZcih#

 

.%ß;ZcXZ

 

AdX`Cji

 

)*ßHideHXgZl

Figure 69..%˚adX`cjiVcY)*ßhidehXgZl#

.%ßHide

)*ßAdX`

HXgZl

 

Cji

6c\aZY7gVX`Zi

 

Figure 70#.%˚hidehXgZlVcY)*ßadX`cji#

"))"

<%+,*&%?d^ciZg$EaVcZg8dbWdBVX]^cZ

Image 46
Contents Model G0675 JOINTER/PLANER Combo Machine Ss ,EAD from Leadbased PAINTS Table of Contents Contact Info IntroductionManual Accuracy Functional Overview +,*&%?dciZg$EaVcZg8dbWdBVXcZIdentification %+,*YZciXVidc#Machine Data Sheet Knife Information Jointer  !,7!93 53%3 %!2.2 02/4%#4/ %. /0%2!4.! -!#.%29 BVXcZgn cdhZ XVc XVjhZ eZgbVcZci ZVgc\adhh# 53%3!!2/5.$%$ %84%.3/..#/2$ 2!4%$4&/2/4%-!#.%!-0%2!%2  !,7!93 ,/#+ -/,% !3%33 & 53%$ % %&/2% /0%2!4. -!#.%29#Additional Safety Instructions for Jointers Additional Safety Instructions for Planers Circuit Requirements 220V OperationUnpacking SetupItems Needed for Setup Description QtyInventory Clean Up Box 1 Figure QtyMoving & Placing Base Unit Placement LocationSite Considerations Floor LoadTo mount the base to the floor Mounting to Shop FloorBolting to Concrete Floors JcaViX iZ bVXcZ ide gdb iZ WVhZ Vi WdiZcYh #Assembly To assemble the machineDust Collection To connect a dust collection hoseSetting Outfeed Table Height To set the outfeed table heightTest Run Jointer Operation SetupdcPage 23#To test run the machine Factory adjustments that should be verified Recommended AdjustmentsBelt Break-In Jointer-Planer ConversiondcPage 22# OperationsON/OFF Button Figure AdX`@cdW 7ZkZa6YjhibZci @cdW AdX`AZkZg Basic Planer Controls Planer Operation SetupJointer-Planer Conversion 9jhiEdgi IjbW@cdW AdX` AZkZg Jointer Operation SetupGZchiVaaiZZcXZ# With Grain Stock Inspection and RequirementsAgainst Grain IZ Xdc Squaring StockThickness Planer Specific Rules AViliVdciZg#To surface plane on the jointer  GZVYVcYjcYZghiVcY SAFETY, WZ\ccc\dcPage 6#Surface Planing ¿-&¿ HiVgiiZdciZg#  GZeZVi jciaiZZcigZhjgVXZhaVi#To edge joint on the jointer Edge Jointing GZeZVi jciaiZZcigZZY\ZhaVi# Bevel Cutting To bevel cut on the jointer EjidchVZin\aVhhZh# Thickness Planer OperationTo use the planer ¿¶&¿&+#  HiVgiiZeaVcZg#XVciWZiddXVgZjalihdehVZin AccessoriesIZhZ\aVhhZhbZZi6CHO-,#&%%heZXXV T20502 T20452 T20503 T20448 T20456 H0736Schedule MaintenanceCleaning Belts GZeZVi id gZbdkZ iZ gdci VXXZhh eVcZa# Adjusting/Replacing Feed Belts8VeHXgZlh GdciKZl AVi9gkZ7Zai Bdidg EjaaZn AdX`c\CjiFence Lubrication™ ZcXZon this page Feed Roller Chain, Sprocket and Cogwheels Blade Guard ArmLeadscrews AdXVidch#=VcYlZZa Outfeed TableTable Height Chain & Planer Handwheel Ac`V\ZTroubleshooting ServiceHnbeidb EdhhWaZ8VjhZ EdhhWaZHdajidc CdiadX`# WZc\XadhZY# AZkZg# XdcXZei# Jointer Table ParallelismChecking Outfeed Table Parallelism To check outfeed table parallelismTo correct outfeed table parallelism Correcting Outfeed Table to Cutterhead ParallelismTable to Cutterhead Parallelism  8dcicjZ id Checking Infeed Table ParallelismdcPageAdjusting Infeed Table Parallelism Checking Infeed Table ParallelismVaaZaliZVXdiZg!egdXZZYidInspecting To inspect the knives with the knife setting gaugeInspecting Knives Knives#\i# Adjusting/Replacing KnivesDjiZZY CZZY \iZc ?VX` HXgZl W7dai WSetting Fence Stops To set the 90˚ fence stop To set the 45˚ fence stopTo adjust feed roller spring tension Spring Tension7daih Replacing Feed RollersTo replace the front and rear feed rollers IVWaZ#13. GZbdkZ iZ Zm lgZcX id gZiZchdc iZ XVc# To adjust the chain tensionChain Tension ViZgXZX`c\XVciZchdc#Maximum Allowable Tolerances Planer Table ParallelismTable Parallelism Inspection Tools NeededQty8jiiZgZVY IVWaZ Table Parallelism AdjustmentsTo adjust the table parallelism  AdlZgiZiVWaZVcYoZgddjiiZGdiVXVidg# IVWaZ 7VhZ10. BdkZiZXVcVlVngdbdcaniZhegdX`Zi Anti-Kickback FingersWZijgcZYcYZeZcYZcidiZXVc# Wiring Wiring Safety Instructions8jiiZgZVYAbiHliX EdlZgHjeean 8dccZXidc HliX 6hhZbWan Wiring Overview220 VAC ON/OFF Switch Assembly Wiring IdEdlZgHjeean IdAbiHliX IdBdidgComponents Wiring #Bdidglgc\#Parts Table BreakdownMotor Assembly Breakdown DescriptionFrame Breakdown DescriptionFence Assembly Breakdown Feed Gear Assembly Breakdown Feed Gear Assembly Parts List Cutterhead-Feed Rollers Breakdown Access Panels Breakdown Base Breakdown Planer Table Breakdown Planer Table Parts List Labels and Cosmetic Parts8VWcZiBV`Zg =dlYYndjaZVgcVWdjijh4 TTTT 6YkZgihZbZci  Tttt gZcYTTTT 8VgY9ZX`  Tttt LZWhiZ TTTT DiZg IdYVn»h=dbZdlcZgEaVXZ HiVbe =ZgZ $5342!, .# 0/ /8  %,,.!- 7! 22!.49 !.$ 2%452.3 #ALL 4ODAYD&ORO! &2%%