3-10. Selecting 220 Volts AC Single/Three Phase Input Voltage
1
2
34
Tools Needed:
5/16 in
YTurn Off welding power source, and disconnect
input power before proceeding.
Check input voltage available at site.
1Voltage Selection View Window
The input voltage that the power source is linked for appears in the Voltage Selection View Window.
Check voltage selected in unit. Changing selection is only necessary if selected value does not match available input voltage.
To change relinking board position, remove top cover and left side panel.
2Relinking Board
3Terminal Screws Loosen terminal screws.
4Relinking Board (Connection For 220 VAC Single/Three Phase Input Power)
Slide relinking board off connected terminals, move relinking board to correct input voltage terminals, and secure relinking board.
.Be sure to tighten all four screws securing relinking board in place.